Those small parking lot errors are system errors that occur because someone has left the road, and Waze interpreted it as a disconnected or missing road. They should be simply marked as solved and move on. Paving a road all around a single building is not necessary, and it exceeds the current editing guidelines. A single lane into the parking lot is acceptable. The rest is not. AND that cluster of roads is worthless anyway because it is not yet complete recently some unfinished roads were appearing in the client but that is not the standard and normally they will not appear in the client and are not routeable. Further the person who created the linked parkinglot should have linked the roads to the existing cross road, not created a new junction. As that is currently drawn Waze will not route a left turn into that parking lot, they will be taken past the location, told to make a U-turn and then turn right into the lot.
Also those UR's at gas stations will be eliminated by placing Gas Station Landmarks set to cover the entire gas station (but not snapped to the surrounding roads).


