Toll roads progress
Update: And we're 100% done! If there are any new toll roads in your area, please post here and let us know. In the mean time, you can also help update the wiki here: http://world.waze.com/wiki/index.php?ti ... (Malaysia)
Let's get the 'avoid toll road' option enabled in Malaysia.
Here's a list of the possible toll roads that I know of. If you know of one that's not here, post a reply and I'll add it to this post.
Pick a highway and then check that the correct segments are checked as toll roads. At a minimum, the segments before and after the toll plaza must be flagged. Optionally, you can flag the segments after the last free exit before a toll. Here's an example. https://world.waze.com/editor/?zoom=5&l ... ,148403923
Once you've confirmed that all tolls have been flagged, reply here and I'll move the highway name to the DONE list.
If you're not able to check the whole highway (e.g. long highways like E1 and E2), just post the exit numbers that you've been able to confirm.
DONE
E1 Lebuhraya Utara Selatan (north route)
E1 Lebuhraya NKVE - Bukit Raja, Setia Alam, Subang, Damansara, Kota Damansara, Jalan Duta
E2 Lebuhraya Utara Selatan (south route)
E3 Laluan Kedua Malaysia-Singapura LINKEDUA
E5 Lebuhraya Shah Alam KESAS
E6 ELITE
E7 Cheras-Kajang GRANDSAGA
E8 KL - Karak - Gombak, Bentong
E9 Lebuhraya Sungai Besi - Mines (N), Mines (S)
E9 Shamelin highway not completed
E10 NPE - Pantai Dalam, PJS
E11 LDP - Puchong Selatan, USJ, Sunway, Kepong
E12 AKLEH - Dato Keramat
E13 LKSA- Alam Impian, Sri Muda
E15 Butterworth Kulim BKE
E17 BORR - Bagan Ajam, Perai
E18 Kajang SILK
E19 Ipoh - Lumut Expressway no tolls
E20 Maju Expressway MEX - Salak South, Putrajaya
E21 Kajang-Seremban LEKAS
E22 Lebuhraya Senai-Desaru - Senai, Ulu Tiram, Cahaya Baru, Penawar
E23 SPRINT - Penchala, Damansara, Kerinchi
E24 Jambatan Tun Salahuddin
E25 LATAR - Ijok, Kuang (Barat), Kuang (Timur), Taman Rimba Templer
E26 Lebuhraya SKVE - Telok Panglima Garang, SKVE Saujana Putra, Ayer Hitam (Tanjung Dua Belas ,Pulau Carey & Pulau Indah under construction)
E28 Pantai Barat no tolls
E29 Seremban Port Dickson SPDH
E30 Lebuhraya Selat Klang Utara (100% done)- Bukit Raja, Kapar, Kapar(Barat), Kapar(Timur)
E33 Lebuhraua DUKE - Batu, Sentul Pasar, Ayer Panas
E35 Lebuhraya Guthrie - Lagong, Elmina, Jelutong
E36 Jambatan Pulau Pinang (Penang Bridge)
E37 KL-Seremban no tolls
E37 Lebuhraya Timur-Barat(Salak) no tolls
E38 SMART
2 Lebuhraya Persekutuan (100% done)- Sungai Rasau, Batu Tiga
Lanang Bridge, Sibu
ASEAN Bridge, Miri
Last update: 13-June 6:30 PM
Let's get the 'avoid toll road' option enabled in Malaysia.
Here's a list of the possible toll roads that I know of. If you know of one that's not here, post a reply and I'll add it to this post.
Pick a highway and then check that the correct segments are checked as toll roads. At a minimum, the segments before and after the toll plaza must be flagged. Optionally, you can flag the segments after the last free exit before a toll. Here's an example. https://world.waze.com/editor/?zoom=5&l ... ,148403923
Once you've confirmed that all tolls have been flagged, reply here and I'll move the highway name to the DONE list.
If you're not able to check the whole highway (e.g. long highways like E1 and E2), just post the exit numbers that you've been able to confirm.
DONE
E1 Lebuhraya Utara Selatan (north route)
E1 Lebuhraya NKVE - Bukit Raja, Setia Alam, Subang, Damansara, Kota Damansara, Jalan Duta
E2 Lebuhraya Utara Selatan (south route)
E3 Laluan Kedua Malaysia-Singapura LINKEDUA
E5 Lebuhraya Shah Alam KESAS
E6 ELITE
E7 Cheras-Kajang GRANDSAGA
E8 KL - Karak - Gombak, Bentong
E9 Lebuhraya Sungai Besi - Mines (N), Mines (S)
E9 Shamelin highway not completed
E10 NPE - Pantai Dalam, PJS
E11 LDP - Puchong Selatan, USJ, Sunway, Kepong
E12 AKLEH - Dato Keramat
E13 LKSA- Alam Impian, Sri Muda
E15 Butterworth Kulim BKE
E17 BORR - Bagan Ajam, Perai
E18 Kajang SILK
E19 Ipoh - Lumut Expressway no tolls
E20 Maju Expressway MEX - Salak South, Putrajaya
E21 Kajang-Seremban LEKAS
E22 Lebuhraya Senai-Desaru - Senai, Ulu Tiram, Cahaya Baru, Penawar
E23 SPRINT - Penchala, Damansara, Kerinchi
E24 Jambatan Tun Salahuddin
E25 LATAR - Ijok, Kuang (Barat), Kuang (Timur), Taman Rimba Templer
E26 Lebuhraya SKVE - Telok Panglima Garang, SKVE Saujana Putra, Ayer Hitam (Tanjung Dua Belas ,Pulau Carey & Pulau Indah under construction)
E28 Pantai Barat no tolls
E29 Seremban Port Dickson SPDH
E30 Lebuhraya Selat Klang Utara (100% done)- Bukit Raja, Kapar, Kapar(Barat), Kapar(Timur)
E33 Lebuhraua DUKE - Batu, Sentul Pasar, Ayer Panas
E35 Lebuhraya Guthrie - Lagong, Elmina, Jelutong
E36 Jambatan Pulau Pinang (Penang Bridge)
E37 KL-Seremban no tolls
E37 Lebuhraya Timur-Barat(Salak) no tolls
E38 SMART
2 Lebuhraya Persekutuan (100% done)- Sungai Rasau, Batu Tiga
Lanang Bridge, Sibu
ASEAN Bridge, Miri
Last update: 13-June 6:30 PM
Re: Toll roads progress