# Hungary Road Closure Requests

**URL:** https://www.waze.com/discuss/c/editors/hungary/hungary-road-closure-requests/4971.md

[Latest](https://www.waze.com/discuss/latest.md) · [Categories](https://www.waze.com/discuss/categories.md) · [Tags](https://www.waze.com/discuss/tags.md)

---

## [About the Hungary Road Closure Requests category](https://www.waze.com/discuss/t/about-the-hungary-road-closure-requests-category/355754)

<div class="topic-metadata">

**Author:** [@shirapashu](https://www.waze.com/discuss/u/shirapashu)\
**Replies:** 1\
**Last updated:** [October 16, 2024, 4:25pm UTC](https://www.waze.com/discuss/t/about-the-hungary-road-closure-requests-category/355754 "2024-10-16T16:25:05Z")

</div>

---

## [Dédestapolcsány – Kossuth Lajos Street bridge closure](https://www.waze.com/discuss/t/dedestapolcsany-kossuth-lajos-utca-hid-lezarasa/413598)

<div class="topic-metadata">

**Author:** [@Atisomm](https://www.waze.com/discuss/u/Atisomm)\
**Replies:** 3\
**Last updated:** [October 6, 2026, 10:44pm UTC](https://www.waze.com/discuss/t/dedestapolcsany-kossuth-lajos-utca-hid-lezarasa/413598 "2026-10-06T22:44:58Z")

</div>

Hi everyone! The bridge on Kossuth Lajos Street in Dédestapolcsány has collapsed, so the road is currently completely impassable in both directions. The closure has been in place for months now and is not expected to be lifted for a long time. K…

---

## [Szentendre Danube Promenade](https://www.waze.com/discuss/t/szentendre-duna-korzo/413530)

<div class="topic-metadata">

**Author:** [@world\_uqmv2vqq](https://www.waze.com/discuss/u/world_uqmv2vqq)\
**Replies:** 0\
**Last updated:** [October 2, 2026, 3:56am UTC](https://www.waze.com/discuss/t/szentendre-duna-korzo/413530 "2026-10-02T03:56:32Z")

</div>

The middle section of the Duna Promenade (Duna korzó) in Szentendre is closed. Entry is only allowed with a permit. It is not suitable for through traffic. Could someone please update the map? Thank you.

---

## [Chain Bridge, Budapest](https://www.waze.com/discuss/t/lanchid-budapest/413529)

<div class="topic-metadata">

**Author:** [@world\_uqmv2vqq](https://www.waze.com/discuss/u/world_uqmv2vqq)\
**Replies:** 0\
**Last updated:** [October 2, 2026, 3:52am UTC](https://www.waze.com/discuss/t/lanchid-budapest/413529 "2026-10-02T03:52:28Z")

</div>

WAZE regularly wants to take me across the Chain Bridge, even though it has been restricted to buses and taxis for years. Could someone update the map? Thank you

---

## [Road closure in Budaörs (HU-2400)](https://www.waze.com/discuss/t/road-closure-in-budaors-hu-2400/411917)

<div class="topic-metadata">

**Author:** [@drGyula](https://www.waze.com/discuss/u/drGyula)\
**Replies:** 0\
**Last updated:** [September 10, 2026, 1:48pm UTC](https://www.waze.com/discuss/t/road-closure-in-budaors-hu-2400/411917 "2026-09-10T13:48:26Z")

</div>

Ròzsa St is closed between Mátyás király St and Tátra St due to public utility reconstruction works.

---

## [Budapest XXI., Road Closure request](https://www.waze.com/discuss/t/budapest-xxi-road-closure-request/411244)

<div class="topic-metadata">

**Author:** [@zolikonta](https://www.waze.com/discuss/u/zolikonta)\
**Replies:** 0\
**Last updated:** [August 31, 2026, 2:54pm UTC](https://www.waze.com/discuss/t/budapest-xxi-road-closure-request/411244 "2026-08-31T14:54:09Z")

</div>

Hi Editors, I’ll appreciate your assistance with adding a road closure. Permalink: https://waze.com/hu/editor?env=row&lat=47.40487&lon=19.08309&s=1235931857339912019446&zoomLevel=18&segments=393337768,393337767,1021870…

---

## [Nyíregyháza Korányi Frigyes Road](https://www.waze.com/discuss/t/nyiregyhaza-koranyi-frigyes-ut/410571)

<div class="topic-metadata">

**Author:** [@TurkAttila](https://www.waze.com/discuss/u/TurkAttila)\
**Replies:** 0\
**Last updated:** [August 21, 2026, 12:25pm UTC](https://www.waze.com/discuss/t/nyiregyhaza-koranyi-frigyes-ut/410571 "2026-08-21T12:25:17Z")

</div>

Segment ID: 417443116 The Bus is not a Waze topic, but they know the exact start date, which is August 24.

---

## [Szolnok Helicopter Roundabout closure on August 10](https://www.waze.com/discuss/t/szolnok-helikopteres-korforgalom-lezaras-08-10/409695)

<div class="topic-metadata">

**Author:** [@malna\_1](https://www.waze.com/discuss/u/malna_1)\
**Replies:** 1\
**Last updated:** [August 7, 2026, 7:54pm UTC](https://www.waze.com/discuss/t/szolnok-helikopteres-korforgalom-lezaras-08-10/409695 "2026-08-07T19:54:19Z")

</div>

On Monday, pavement defects on the exit branch leading toward downtown Szolnok at the so-called helicopter roundabout on the 3225 Szolnok–Jászkisér connecting road will be repaired. This is how the traffic diversion will work The Hungarian Pu…

---

## [Tiszafüred](https://www.waze.com/discuss/t/tiszafured/407310)

<div class="topic-metadata">

**Author:** [@borosr09](https://www.waze.com/discuss/u/borosr09)\
**Replies:** 0\
**Last updated:** [June 29, 2026, 3:19pm UTC](https://www.waze.com/discuss/t/tiszafured/407310 "2026-06-29T15:19:10Z")

</div>

Hi everyone. If anyone has the authorization, please approve the Saint Francis of Assisi Retreat House in Tiszafüred, because people can never find us. Thank you!

---

## [Szirák Kisbágyon Street closed](https://www.waze.com/discuss/t/szirak-kisbagyoni-utca-lezarva/402482)

<div class="topic-metadata">

**Author:** [@DoffyCool](https://www.waze.com/discuss/u/DoffyCool)\
**Replies:** 2\
**Last updated:** [May 4, 2026, 8:30pm UTC](https://www.waze.com/discuss/t/szirak-kisbagyoni-utca-lezarva/402482 "2026-05-04T20:30:07Z")

</div>

Hi everyone In Szirák, Kisbágyoni Street is completely closed between Petőfi and Rákóczi Street due to bridge renovation. You have to detour towards Malom Street, but being a beginner, I don't know how to share this information&hellip;

---

## [Downtown Szentendre](https://www.waze.com/discuss/t/szentendre-belvaros/391119)

<div class="topic-metadata">

**Author:** [@OlNra](https://www.waze.com/discuss/u/OlNra)\
**Replies:** 1\
**Last updated:** [April 3, 2026, 11:41am UTC](https://www.waze.com/discuss/t/szentendre-belvaros/391119 "2026-04-03T11:41:15Z")

</div>

Hi everyone! Could someone with the necessary permissions please approve my edit? It has been an issue for years that entering the main square of Szentendre and its surroundings is permit-only, but GPS regularly routes everyone through there, &hellip;

---

## [Fekete-Körös Bridge Gyula-Sarkad](https://www.waze.com/discuss/t/fekete-koros-hid-gyula-sarkad/390813)

<div class="topic-metadata">

**Author:** [@szabbe37](https://www.waze.com/discuss/u/szabbe37)\
**Replies:** 0\
**Last updated:** [September 16, 2025, 5:01am UTC](https://www.waze.com/discuss/t/fekete-koros-hid-gyula-sarkad/390813 "2025-09-16T05:01:40Z")

</div>

Hi everyone, the Fekete-Körös bridge will be closed between September 22 and October 10, 2025.

---

## [Szeged Gogol Street closure](https://www.waze.com/discuss/t/szeged-gogol-utca-lezaras/390721)

<div class="topic-metadata">

**Author:** [@mutayolo](https://www.waze.com/discuss/u/mutayolo)\
**Replies:** 0\
**Last updated:** [September 14, 2025, 5:16pm UTC](https://www.waze.com/discuss/t/szeged-gogol-utca-lezaras/390721 "2025-09-14T17:16:44Z")

</div>

Hi everyone! In Szeged, the renovation of Gogol Street started in June, and along with this, “no entry” signs have currently been put up between Bolyai Street and Londoni Boulevard, with an “except residents and construction traffic” additional plate, however Waze …

---

## [Closure of the level crossing at the intersection of Main Road 10 and Railway Line 4 in Nyergesújfalu](https://www.waze.com/discuss/t/nyergesujfalu-telepulesen-talalhato-10-sz-fout-es-a-4-sz-vasutvonal-csomopontjaba-levo-utatjaro-lezarasa/388839)

<div class="topic-metadata">

**Author:** [@world\_s45kyxxl](https://www.waze.com/discuss/u/world_s45kyxxl)\
**Replies:** 2\
**Last updated:** [August 19, 2025, 8:06pm UTC](https://www.waze.com/discuss/t/nyergesujfalu-telepulesen-talalhato-10-sz-fout-es-a-4-sz-vasutvonal-csomopontjaba-levo-utatjaro-lezarasa/388839 "2025-08-19T20:06:17Z")

</div>

The road-rail level crossing located at the intersection of Main Road No. 10 and Railway Line No. 4 in the municipality of Nyergesújfalu must be completely closed for the duration of the works. Consequently, traffic will be diverted and will pro&hellip;

---

## [Csángó Festival – Jászberény (Aug 6–11, 2025) – Road closures and temporary traffic regulations](https://www.waze.com/discuss/t/csango-fesztival-jaszbereny-2025-08-06-11-utzarak-es-ideiglenes-forgalmi-rend/387034)

<div class="topic-metadata">

**Author:** [@CsakPityu](https://www.waze.com/discuss/u/CsakPityu)\
**Replies:** 0\
**Last updated:** [July 20, 2025, 10:52am UTC](https://www.waze.com/discuss/t/csango-fesztival-jaszbereny-2025-08-06-11-utzarak-es-ideiglenes-forgalmi-rend/387034 "2025-07-20T10:52:09Z")

</div>

The 2025 Csángó Festival will be held in Jászberény from August 6 to 10. Due to the event, several streets will be closed, and some sections will be temporarily converted to two-way traffic. The following road sections will be fully closed…

---

## [Pentele Bridge](https://www.waze.com/discuss/t/pentele-hid/386962)

<div class="topic-metadata">

**Author:** [@murphyke](https://www.waze.com/discuss/u/murphyke)\
**Replies:** 0\
**Last updated:** [July 18, 2025, 7:35pm UTC](https://www.waze.com/discuss/t/pentele-hid/386962 "2025-07-18T19:35:15Z")

</div>

The Pentele Bridge is closed from Friday afternoon, July 18th, until Sunday, July 20th. Don't go that way.

---

## [Szombathely: Brenner Tóbiás Boulevard - Nárai Street roundabout closure for utility connection](https://www.waze.com/discuss/t/szombathely-brenner-tobias-korut-narai-utca-korforgalom-lezaras-kozmu-bekotes-miatt/384118)

<div class="topic-metadata">

**Author:** [@NemLac74](https://www.waze.com/discuss/u/NemLac74)\
**Replies:** 0\
**Last updated:** [May 29, 2025, 2:03pm UTC](https://www.waze.com/discuss/t/szombathely-brenner-tobias-korut-narai-utca-korforgalom-lezaras-kozmu-bekotes-miatt/384118 "2025-05-29T14:03:01Z")

</div>

Hi everyone! In Szombathely, you can't turn off from Brenner Tóbiás Boulevard towards Nárai Street at the roundabout due to utility connection work. It's single-lane. You can still exit from Nárai Street; there's a large excavation pit a few meters from the roundabout, don't…
