# FYI: I-75/I-24 in Chattanooga

**URL:** https://www.waze.com/discuss/t/fyi-i-75-i-24-in-chattanooga/116249
**Category:** Tennessee
**Created:** [November 13, 2012, 3:10am UTC](https://www.waze.com/discuss/t/fyi-i-75-i-24-in-chattanooga/116249 "2012-11-13T03:10:22Z")
**Posts on this page:** 3
**Page:** 1

<div class="post-metadata">

### Author: ![WeeeZer14](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/w/FFC400/32.png) [@WeeeZer14](https://www.waze.com/discuss/u/WeeeZer14)
#### Post date: [November 13, 2012, 3:10am UTC](https://www.waze.com/discuss/t/fyi-i-75-i-24-in-chattanooga/116249/1 "2012-11-13T03:10:22Z")

</div>

[The big rebuild: Tennessee eyes $100 million redesign of I-75/24 split](http://www.timesfreepress.com/news/2012/nov/12/the-big-rebuild-tennessee-eyes-100-million-redesig/)

> [@](#):
>
> The $100 million-plus project is part of a larger I-75 corridor study that also calls for widening the highway to eight lanes from the Georgia line to I-24; improving exit and entry at the East Brainerd Road interchange and adding more lanes to I-75 between exit 11 at Collegedale and exit 20 in Cleveland, all by 2029.

[I-75 corridor feasibility study](http://www.tdot.state.tn.us/i75/)

![](http://media.timesfreepress.com/img/photos/2012/11/11/111212bCorridorStudy_t618.jpg?ba5b5b122dd3d37cc13d83e92a6a0ec0d5bfa32a)

---

<div class="post-metadata">

### Author: ![R4CLucky14](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/r/FD804B/32.png) [@R4CLucky14](https://www.waze.com/discuss/u/R4CLucky14)
#### Post date: [November 17, 2012, 12:25am UTC](https://www.waze.com/discuss/t/fyi-i-75-i-24-in-chattanooga/116249/2 "2012-11-17T00:25:06Z")

</div>

This is gonna be exciting. But I still think they need to improve I-24 Eastbound in the city, when taking the slope up the hill. That hill causes a slowdown for the entire length of the city. I never really have much slow down, going from I-24 East to I-75 North, even during Rush Hour, after that hill.

---

<div class="post-metadata">

### Author: ![paulwelch23](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/p/963EFF/32.png) [@paulwelch23](https://www.waze.com/discuss/u/paulwelch23)
#### Post date: [November 17, 2012, 9:04pm UTC](https://www.waze.com/discuss/t/fyi-i-75-i-24-in-chattanooga/116249/3 "2012-11-17T21:04:25Z")

</div>

> [@R4CLucky14](#):
>
> This is gonna be exciting. But I still think they need to improve I-24 Eastbound in the city, when taking the slope up the hill. That hill causes a slowdown for the entire length of the city. I never really have much slow down, going from I-24 East to I-75 North, even during Rush Hour, after that hill.

I absolutely agree. The ridge cut is horrible during rush hour and this will do little to help. I think that alleviating the ridge cut should be a higher priority than this.

Sent from my DROID RAZR using Tapatalk 2
