Level 4 - I-70 at US 40 E Exit, Ellicott City MD

Since my Level 4 has not yet been approved, please update this ramp segment to match the BGS:

I would suggest to create a short (200 m or more) ramp segment, as the road type goes from the interstate directly into “major highway” as the road type. It will solve an “Incorrect Junction” UR.

Thanks.

So I made a bit longer ramp segment. What do you think about the current configuration?

That looks great, thanks.