The stretch of road between Preston and Parkwood on Stonebrook Parkway needs returned to normal. They are doing a traffic switch today (see below). The roads will all be one way with the crossing streets connected as needed. The street names need to remain marked as construction zone for now as there will still be construction going on as there are intersections that need completed, curbs constructed, etc.
I am a level 1 editor and had requested that these segments be locked to level 5 a year ago because of the construction.
Map location with part of the roads marked: https://www.waze.com/editor/?lon=-96.8112&lat=33.13671&zoom=4&layers=TBFTFFTTTTTTTTTTTTTTTTTTT&segments=64633704,75374364,49494306,49486666,49495694,49493102,49488351,49517579,49486684,64633867,49486018,49522624&env=usa
Notice of traffic changes: http://us4.campaign-archive1.com/?u=33cd614c011fb86a5e16e4f59&id=246869b07e&e=655b89690f
If you cannot see this webpage, let me know and I’ll post the text of the notice.
Thank you in advance for making these changes. If you have any questions, please let me know.