Can someone take a look at the following and let me know if I assessed it correctly and provide me feedback?
And, fix it? I’m a Level 3.
UR is reporting a missing bridge overpass:
- Tri-State S = (Elevation) Ground
- Tri-State N = -3
- Willow Rd runs over the Tri-State Tlwy. The segment over the tollway = Ground.
- The Willow Rd segments before and after the segment that runs over the tollway = Ground.
Is my suggested fix correct?
- Set Tri-State S = -3 (to maintain consistency with Tri-State N).
- Keep Tri-State N = -3
- Keep Willow Road = Ground (to keep the grade identical to the connecting segments).
Many thanks.