# Maryland Construction Projects

**URL:** <https://www.waze.com/discuss/t/maryland-construction-projects/46937>\
**Category:** Maryland\
**Created:** [July 17, 2013, 8:57pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937 "2013-07-17T20:57:39Z")\
**Posts on this page:** 20\
**Page:** 1

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [July 17, 2013, 8:57pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/1 "2013-07-17T20:57:39Z")

</div>

This is a list of construction projects in Maryland that are major enough to require changes to the map, so that editors are aware of them and to discuss the status of them, especially since satellite imagery and GPS points may not reflect current conditions. Due to the delay before edits to go live, projects and closures expected to last less than two weeks should be discussed here before editing the map. Post here to report a construction project - I will add it to the list in order of completion date and acknowledge your post by marking it with “thanks”. Also, please notify me of any incorrect or missing information, or upon the completion of a project.

Allegany County  
I-68 Bridge over Kelly Road & CSX  
Bridge rehabilitation that has resulted in a closure and detour of the entrance ramp from Lee St to I-68 W.  
Expected Completion: Late Fall 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=39.64706&lon=-78.77308&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=AL421511)  
Baltimore City

I-895/Potee Street (MD-2) Interchange  
Roadway reconstruction that has resulted in ramp closures and detours for several months. Phase 1, which involves closing the onramp from Potee Street to I-895 N, has been completed, and Phase 2 , which involves closing the offramp from I-895 S to Potee Street, is underway.  
Expected Completion: Early 2014  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=39.23935&lon=-76.61042&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTT)  
[Project Site](http://www.mdta.maryland.gov/News/MDTA_News_Items/THREE_MONTH_CLOSURE_OF_RAMP_FROM_POTEE_STREETPATAPSCO_AVENUE_TO_NORTHBOUND_I895_)  
[Revised Schedule](http://www.mdta.maryland.gov/News/MDTA_Traffic_Advisories/UPDATED_SCHEDULE_THREE_MONTH_CLOSURE_OF_RAMP_FROM_POTEE_STREETPATAPSCO_AVENUE_TO_NORTHBOUND_I895)

Sinclair Lane/Edison Highway Bridge over CSX Railroad  
Bridge rehabilitation that has resulted in a complete closure of both roads at their intersection.  
Expected Completion: May 2014  
[Permalink](https://www.waze.com/editor/?zoom=7&lat=39.31448&lon=-76.57276&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTT)  
[Project Site](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/2779/Sinclair_Lane_Bridge_Rehabilitation.aspx)

Russell Street/Horseshoe Casino  
Utility relocation that has resulted in the closure of the left lane of Russell Street in both directions, and the addition of a stop sign at the end of the Exit 52 ramp from I-95 N. There are no full time, long term closures of the entire road but the section up to Lee Street is temporarily reduced to a minor highway to assist Waze in recommending other routes. Additionally, Warner Street between Worcester Street and Bayard Street is permanently closed (future location of casino garage access) and a new traffic signal has been installed at the intersection of Russell Street and Worcester Street. Left turns from Russell St S to Bayard St are prohibited.  
Expected Completion: May 2014  
[Permalink](https://www.waze.com/editor/?lon=-76.62787&lat=39.27392&zoom=6&layers=TBFTFFTTTTFTTFTTTTTFTTTTTTTTTTTTTTTTTT&env=usa)  
[Traffic Advisory](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/4850/Russell_Street_Utility_Relocation_to_Result_in_Lane_Closures_and_Traffic_Pattern_Shifts.aspx)  
[News Story](http://baltimore.cbslocal.com/2013/10/13/drivers-beware-casino-construction-project-to-shut-down-parts-of-russell-street/)

Frederick Avenue Bridge Replacement  
Frederick Avenue is closed between Brunswick Street and Font Hill Avenue to replace the bridge crossing Gwynns Falls and CSX Railway.  
Expected Completion: Early Fall 2014  
[Permalink](https://www.waze.com/editor/?lon=-76.66163&lat=39.28001&zoom=7&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTTT)  
[Project Site](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/4786/Frederick_Avenue_Bridge_to_Close_Monday.aspx)

Charles Street Reconstruction  
Charles St, NB & SB, will be closed to thru traffic between 29th & Art Museum Dr, and between 33rd & University Pkwy for the duration, ending in mid 2014. Only the portion of Charles St between Art Museum Dr & 33rd will remain open to cross traffic (E & W) at all times throughout the Project. Emergency Vehicle Access through the entire construction area is to be maintained at all times (Ambulance / Police / Fire vehicles only).  
Expected Completion: Fall 2014  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=39.32743&lon=-76.61786&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://www.charlesstreetreconstruction.com/index.php/home)

West Baltimore MARC Train Station  
Street closures on US-40, W. Franklin, W. Mulberry, and N. Pulaski near the CSX tracks for the MARC train station construction.  
Expected Completion: Winter 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=39.29298&lon=-76.65135&layers=TBFTFFTTTTTTTFTFTFTFTTTTFT)  
[Project Site](http://www.wbmarcproject.com/)

Broening Highway Reconstruction  
Northbound Broening Highway is closed beyond the Keith Avenue ramp for roadway reconstruction.  
Expected Completion: December 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=39.2639&lon=-76.54266&layers=TBFTFFTTTTFTTFTTTTTFTTTTTT&segments=21879827&env=usa)  
[Press Release](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/5013/Northbound_Broening_Highway_Closure_to_Begin_Saturday.aspx)

Harford Road Bridge Closure  
Upcoming full closure of the Harford Road Bridge for reconstruction, with an anticipated Notice to Proceed of Summer 2015.  
[Permalink](https://www.waze.com/editor/?lon=-76.5763&lat=39.33346&zoom=6&layers=389&env=usa)  
[News Article](http://www.baltimorebrew.com/2014/02/25/its-not-going-to-be-that-bad-official-tells-crowd-wary-of-closing-of-harford-road-bridge/)  
[Federal Overview](https://www.fhwa.dot.gov/construction/accelerated/if08013/)

Central Avenue Rehabilitation  
Several sections of Central Ave (near Orleans St) will be condensed into one lane. Several left hand turns from Central Ave will be temporarily prohibited.  
Expected Completion: August 2017  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=39.29674&lon=-76.59951&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTT)  
[Project Site](http://www.centralavenuerehab.com/)

Baltimore County  
Montrose Avenue  
Montrose Avenue near Turnlee Avenue off of Reisterstown Road in Garrison is closed for utility work.  
Expected Completion: March 27, 2014  
[Permalink](https://www.waze.com/editor/?env=usa&zoom=7&lat=39.40534&lon=-76.75802&layers=TBFTFFTTTTFTTFTTTTTFTTTTTTT)  
[Project Update](http://www.baltimorecountymd.gov/Agencies/publicworks/engineering/projectlists/montroseavepumpstation.html)  
Sherwood Road  
Closed for sewer installation starting January 27.  
Expected Completion: After February 21, 2014  
[Permalink](https://www.waze.com/editor/?zoom=4&lat=39.48168&lon=-76.63757&layers=TBFTFFTTTTFTTFTTTTTFTTTTTFFT&env=usa)  
[Project Site](http://www.baltimorecountymd.gov/Agencies/publicworks/roadbridgeclosings.html)  
I-695/Frederick Road Interchange  
Bridge replacement and interchange improvements. Northern half of new bridge has opened and traffic has been shifted onto it.  
Expected Completion: Spring 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=39.27341&lon=-76.72415&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=BA727533)  
[Overall Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=AW758213)  
I-95 Express Toll Lanes  
Reconstruction and widening of I-95 from I-895 to White Marsh Boulevard, interchange reconstruction at I-895, I-695, and White Marsh Boulevard, and addition of HOT lanes and associated access ramps. Major work is currently happening at the bridge over Campbell Boulevard and the interchange with White Marsh Boulevard.  
Expected Completion: 2014  
[Permalink](https://www.waze.com/editor/?zoom=2&lat=39.3454&lon=-76.49721&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://www.i-95expresstolllanes.com)  
I-95/White Marsh Boulevard Interchange  
Reconstruction of the interchange of I-95 and MD-43 (White Marsh Boulevard) to accommodate the new express lanes. On Tuesday, October 29, a realigned ramp for Exit 67B (I-95 N to MD-43 W) is scheduled to open, and on Friday, November 15, a realigned ramp for Exit 67A (I-95 S to MD-43 E) is scheduled to open.  
Expected Completion: 2014  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=39.37897&lon=-76.44861&layers=TBFTTFTTTTFTTFTTTTTFTTTTTTTTTTTTTTTTTTT&env=usa)  
[Project Site](http://www.i-95expresstolllanes.com/constr_projects/i95_md43_interchange.asp)  
[Rendering of Final Layout](http://www.i-95expresstolllanes.com/images/interchange_aerials/2012-02-13/proposed_md43_rendering.jpg)  
[Traffic Advisory](http://www.i-95expresstolllanes.com/linked_files/traffic_advisories/traffic_advisory_102313.pdf)  
Frederick County

Taneytown Pike (MD-140) Bridge over Monocacy River  
Bridge replacement that will result in a realignment of the road.  
Expected Completion: May 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=39.67907&lon=-77.23471&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=FR5045110)

Harford County  
Maryland/Chesapeake House I-95 Rest Area Renovation (also in Cecil County)  
Maryland House is completely closed. Early construction work has started on Chesapeake House.  
Expected Completion (Maryland House): Fall/Winter 2013-14  
[Permalink (Maryland House)](https://www.waze.com/editor/?zoom=4&lat=39.49744&lon=-76.23053&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTT)  
[Permalink (Chesapeake House)](https://www.waze.com/editor/?zoom=4&lat=39.61232&lon=-76.00741&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://www.i95mdtravelplazas.com/)  
[Site Aerials](http://www.i95mdtravelplazas.com/construction-photo-gallery/category/7-aerials)  
Moores Mill Road Improvements  
Roadway improvements along Moore’s Mill Road from US 1 for approx 4360 feet ending approx 500 feet west of Broadway. During construction, the road will be closed to through traffic, but all local residents will retain access to their homes.  
Expected Completion: April 2014  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=39.54892&lon=-76.34398&layers=TBFTFFTTTTTTTFTTTTTTTTTFTT&segments=22187878,22187877,22166810,75664252,66764250,22176264,75664207,71163691)  
[Project Site](http://www.harfordcountymd.gov/dpw/construction/index.cfm?ID=265&MapID=91)  
[Baltimore Sun Article](http://www.baltimoresun.com/news/maryland/harford/belair/ph-ag-moores-mill-closing-0531-20130529,0,3923682.story)  
Howard County

Lynx Lane  
Lynx Lane is closed in the vicinity of Wilde Lake High School in Columbia, with a posted detour. These memos seem to indicate this will be a permanent closure of the road, whereby it will be converted to a pedestrian walkway with access provided for emergency vehicles only. However, this document is over a year old, and it’s not clear whether Howard County has made a final decision to close the road, or if this is just run-of-the-mill construction.  
Expected Completion: Permanent?  
[Permalink](https://www.waze.com/editor/?zoom=7&lat=39.22048&lon=-76.87509&layers=TBFTFFTTTTTTTFTTTTTTTTTTT&env=usa)  
[Memo 1](http://cc.howardcountymd.gov/WorkArea/DownloadAsset.aspx?id=6442461689)  
[Memo 2](http://cc.howardcountymd.gov/WorkArea/linkit.aspx?LinkIdentifier=id&ItemID=6442461602&libID=6442461600)  
[Memo 3](http://cc.howardcountymd.gov/WorkArea/DownloadAsset.aspx?id=6442461690)

Montgomery County  
Shawnee Road  
Closed between MD-355/Frederick Rd and Gateway Center Dr for roadway improvements.  
Expected Completion: Unknown  
[Permalink](https://www.waze.com/editor/?zoom=7&lat=39.22626&lon=-77.27404&layers=TBFTFFTTTTFTTFTTTTTFTTTTTFTT&env=usa)  
[Project Description](http://www.montgomeryplanningboard.org/agenda/2012/documents/20121025_MRShawneeLane_000.pdf)  
New Hampshire Avenue (MD-650) Bridge over Sligo Creek  
The section of Sligo Creek Pkwy immediately west of NH Ave is closed (although access is provided for the businesses there); there are no left turns allowed at the NH Ave intersection during construction.  
Expected Completion: Spring 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=38.98026&lon=-76.98937&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=MO4235115)  
Woodmont Avenue  
Long term closure between Bethesda Avenue and Miller Drive.  
Expected Completion: June 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=38.98069&lon=-77.09403&layers=TBFTFFTTTTFTTFTTTTTFTTTTTFFF&env=usa)  
[Project Site](http://www6.montgomerycountymd.gov/content/dot/tmc/getconstruction.asp)  
[Closure Map](http://atms.montgomerycountymd.gov/tmp_html/Woodmont_2012_garage_31_closure.jpg)  
Prince George’s County

Intercounty Connector (MD-200) Contract D/E  
Construction of the last piece of the freeway, from I-95 to US-1.  
Expected Completion: Late 2013/Early 2014  
[Permalink](https://www.waze.com/editor/?zoom=4&lat=39.0658&lon=-76.88964&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://www.iccproject.com/)  
[Fall Newsletter](http://www.iccproject.com/PDFs/ICC_ContractD-Emailer4_2013-09-23.pdf)

I-95/Contee Road Interchange  
Construction of a new interchange and collector-distributor roads.  
Expected Completion: Summer/Fall 2014  
[Permalink](https://www.waze.com/editor/?zoom=4&lat=39.08429&lon=-76.89569&layers=TBFTFFTTTTFTTFTTTTTFTTTTFTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectInformation.aspx?projectno=PG4195116)

Governor’s Bridge  
The bridge crossing the Patuxent River between Anne Arundel County and Prince George’s County was closed in April 2013 to ALL traffic due to structural deficiencies. There are plans to repair the bridge, and Anne Arundel County DPW has announced a reopening date.  
Expected Completion: April 16, 2014  
[Permalink](https://www.waze.com/editor/?zoom=6&lat=38.95139&lon=-76.693&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTTT)

Leeland Road Water Main Construction  
The Prince George’s County Department of Permitting, Inspections and Enforcement (DPIE) announced that Leeland Road/Oak Grove Road, from Church Road to Moores Plains Boulevard, will be closed to traffic beginning Monday, January 13, 2014 and will reopen to traffic on Friday, August 8, 2014. The temporary road closure is necessary for the Washington Suburban Sanitary Commission (WSSC) to construct a water main.  
Expected Completion: August 8, 2014  
[Permalink](https://www.waze.com/editor/?zoom=3&lat=38.86901&lon=-76.74075&mapUpdateRequest=3406391&env=usa&layers=1029&segments=22019200,74048932)  
[Announcement](http://www.princegeorgescountymd.gov/sites/DPIE/News/Pages/Leeland-Road-Temporarily-Closed-for-Construction-of-a-Water-Main.aspx)

MD-4 / Woodyard Road (MD-223) Interchange  
Replacement of both bridges at this interchange, resulting in a ramp closure and detour.  
Expected Completion: Spring 2016  
[Permalink](https://www.waze.com/editor/?zoom=5&lat=38.81388&lon=-76.82513&layers=TBFTFFTTTTFTTFTTTTTFTTTFTTTTTTTTTTTTTT)  
[Project Site](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectSchedule.aspx?projectno=PG6645116)  
[Press Release](http://www.mdot.maryland.gov/News/Releases/2013May3_SHA_Replaces_MD4bridge_PGCounty.html)

Useful Links

State Highway Administration (SHA)  
[Projects Page](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectHome.aspx?d=37)  
[Weekly Construction Updates](http://www.roads.maryland.gov/pages/mediacontent.aspx?selection=Statewide)

Maryland Transportation Authority (MdTA)  
[Projects Page](http://www.mdta.maryland.gov/Capital_Projects/projects_and_studies.cfm)  
[Alerts & Advisories](http://www.mdta.maryland.gov/)

County Websites  
[Anne Arundel](http://www.aacounty.org/DPW/Highways/roadConstruction.cfm)  
[Baltimore City](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories.aspx)  
[Baltimore](http://www.baltimorecountymd.gov/Agencies/publicworks/roadbridgeclosings.html)  
[Harford](http://www.harfordcountymd.gov/dpw/construction/index.cfm?ID=265)  
[Howard](http://www.co.ho.md.us/displayprimary.aspx?id=6442456023)  
Montgomery - [Construction](http://www6.montgomerycountymd.gov/content/dot/tmc/getconstruction.asp) / [Press Releases](http://www6.montgomerycountymd.gov/apps/dot/PressRelease/pr_list.asp)  
[Prince George’s](http://www.princegeorgescountymd.gov/sites/PublicWorks/news/Pages/default.aspx)

Other  
[WBAL Traffic Alerts](http://www.wbal.com/traffic/)  
[BGE Projects](http://www.bge.com/safetyreliability/reliability/gasandelectricinvestments/pages/default.aspx)

I’ve also found the Facebook and Twitter pages for the SHA and MDTA to be good sources of up-to-date information.

NOTE: The [Wiki](https://wiki.waze.com/wiki/Construction_zone#Construction_zone) has been updated with new guidelines on how to mark segments - their names should now be appended with (Construction Zone) or (Closed) at the end.

---

<div class="post-metadata">

**Author:** ![Mjestic](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/m/FD804B/32.png) [@Mjestic](https://www.waze.com/discuss/u/Mjestic)\
**Post date:** [July 18, 2013, 1:57am UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/2 "2013-07-18T01:57:53Z")

</div>

Good Idea

Central Avenue Rehabilitation Project (Baltimore City)  
Several sections of Central Ave (near Orleans St) will be condensed into one lane. Several left hand turns from Central Ave will be temporarily prohibited. The projected completion date is August 2017.

---

<div class="post-metadata">

**Author:** ![jondrush](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/j/0099FF/32.png) [@jondrush](https://www.waze.com/discuss/u/jondrush)\
**Post date:** [July 18, 2013, 4:58pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/3 "2013-07-18T16:58:45Z")

</div>

Do you want this topic made sticky?

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [July 19, 2013, 4:25am UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/4 "2013-07-19T04:25:36Z")

</div>

jondrush - Yes, that would be great!  
mjestic - I completely forgot about projects on city-maintained streets. I couldn’t find a page on the city website for this, do you know of any?

---

<div class="post-metadata">

**Author:** ![russblau](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/r/0099FF/32.png) [@russblau](https://www.waze.com/discuss/u/russblau)\
**Post date:** [July 23, 2013, 3:11pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/5 "2013-07-23T15:11:52Z")

</div>

1. NH Ave bridge over Sligo Creek, Montgomery County: [http://www.roads.maryland.gov/d3/MD%20650%200VER%20SLIGO%20FLYER.pdf](http://www.roads.maryland.gov/d3/MD%20650%200VER%20SLIGO%20FLYER.pdf). The section of Sligo Creek Pkwy immediately west of NH Ave is closed (although access is provided for the businesses there); there are no left turns allowed at the NH Ave intersection during construction. Expected completion: late fall 2013.

2. Sinclair Lane bridge over CSX Railroad (at Edison Hwy), Baltimore City: [http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/2779/Sinclair\_Lane\_Bridge\_Rehabilitation.aspx](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories/tabid/666/articleType/ArticleView/articleId/2779/Sinclair_Lane_Bridge_Rehabilitation.aspx). Both Sinclair Lane and Edison Hwy are closed at this point. Expected completion: approx. May 2014.

---

<div class="post-metadata">

**Author:** ![Mjestic](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/m/FD804B/32.png) [@Mjestic](https://www.waze.com/discuss/u/Mjestic)\
**Post date:** [July 23, 2013, 5:43pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/6 "2013-07-23T17:43:35Z")

</div>

That Sinclair Ln construction SUCKS. that’s a main thoroughfare on the east side of Baltimore. I never knew how necessary it was!

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [August 13, 2013, 6:03am UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/7 "2013-08-13T06:03:20Z")

</div>

Updates:

The Stoney Creek Bridge and the ramp from 97 to 895 (items 6 & 7 in my first post) both reopened to traffic on Monday, August 12, and I’ve made the necessary edits.

Additionally, the closure of the ramp from 895 to Potee Street (item 5) has been extended to October 2.

---

<div class="post-metadata">

**Author:** ![kodi75](https://www.waze.com/discuss/user_avatar/www.waze.com/kodi75/32/5797_2.png) [@kodi75](https://www.waze.com/discuss/u/kodi75)\
**Post date:** [August 15, 2013, 2:33am UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/8 "2013-08-15T02:33:48Z")

</div>

[Charles street](http://www.charlesstreetreconstruction.com): Would someone more familiar with Charles Village / JHU area monitor the progress?

> [@](#):
>
> Charles St, NB&SB, will be closed to thru traffic between 29th & Art Museum Dr, and between 33rd & Univ.Pkwy for the duration, ending in mid 2014.  
> Only the portion of Charles St btwn Art Museum Dr & 33rd will remain open to cross traffic (E & W) at all times throughout the Project.  
> Emergency Vehicle Access through the entire construction area is to be maintained at all times (Ambulance / Police / Fire) vehicles only.

[MD SHA Projects Page](http://apps.roads.maryland.gov/WebProjectLifeCycle/ProjectHome.aspx?d=37)

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [August 18, 2013, 4:40pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/9 "2013-08-18T16:40:24Z")

</div>

The ramp from 695 IL to Broening Highway (the one that goes under the Key Bridge) is closed until August 29.

[http://www.mdta.maryland.gov/News/MDTA\_Traffic\_Advisories/KEY\_BRIDGE\_SERVICE\_ROAD\_CLOSED\_FOR\_TWO\_WEEKS](http://www.mdta.maryland.gov/News/MDTA_Traffic_Advisories/KEY_BRIDGE_SERVICE_ROAD_CLOSED_FOR_TWO_WEEKS)

---

<div class="post-metadata">

**Author:** ![nzahn1](https://www.waze.com/discuss/user_avatar/www.waze.com/nzahn1/32/107693_2.png) [@nzahn1](https://www.waze.com/discuss/u/nzahn1)\
**Post date:** [September 4, 2013, 9:22pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/10 "2013-09-04T21:22:11Z")

</div>

In baltimore city: don’t forget all the work on US-40, W. Franklin , W. Mulberry, and N. Pulaski near the CSX tracks for the MARC train station construction.

Numerous streets are already closed and have been closed for months!

See here [https://www.waze.com/editor/?zoom=6&lat=39.29298&lon=-76.65135&layers=TBFTFFTTTTTTTFTFTFTFTTTTFT&segments=70737891](https://www.waze.com/editor/?zoom=6&lat=39.29298&lon=-76.65135&layers=TBFTFFTTTTTTTFTFTFTFTTTTFT&segments=70737891)

---

<div class="post-metadata">

**Author:** ![nzahn1](https://www.waze.com/discuss/user_avatar/www.waze.com/nzahn1/32/107693_2.png) [@nzahn1](https://www.waze.com/discuss/u/nzahn1)\
**Post date:** [September 4, 2013, 9:24pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/11 "2013-09-04T21:24:45Z")

</div>

> [@trooster10](#):
>
> mjestic - I completely forgot about projects on city-maintained streets. I couldn’t find a page on the city website for this, do you know of any?

There isn’t a very good one. Here are two places I check:

WBAL Radio has good updates on closures (long & short term): [http://www.wbal.com/traffic/](http://www.wbal.com/traffic/)

The city doesn’t do a good job, but sometimes they post them here: [http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories.aspx](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation/TrafficAdvisories.aspx)

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [September 5, 2013, 2:07am UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/12 "2013-09-05T02:07:00Z")

</div>

Thanks for the info, nzahn! How does the map look right now in regard to the MARC project - is it ok or do changes need to be made? I’m not there often but next time I’m on MLK Blvd I’ll swing by and check it out.

Also, here’s the project site, but there’s very little info:  
[http://www.wbmarcproject.com/category/construction-alerts/](http://www.wbmarcproject.com/category/construction-alerts/)

---

<div class="post-metadata">

**Author:** ![nzahn1](https://www.waze.com/discuss/user_avatar/www.waze.com/nzahn1/32/107693_2.png) [@nzahn1](https://www.waze.com/discuss/u/nzahn1)\
**Post date:** [September 5, 2013, 12:49pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/13 "2013-09-05T12:49:09Z")

</div>

> [@trooster10](#):
>
> How does the map look right now?

I drove by yesterday and there were numerous road closures, and when I got onto the WME, there were a couple “didn’t follow route” flags. I’ve disconnected pulaski and franklin until they reopen these roads.  
It should be up to date, but I will also drive by to check on progress in the area.

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [September 5, 2013, 1:31pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/14 "2013-09-05T13:31:53Z")

</div>

Ok, sounds good nzahn! Also I’ve updated the original post with the information that you and everyone else provided here. I checked the SHA website and added projects in Harford and PG Counties, and found a few projects in western Maryland that I’ll add shortly. I didn’t include bridge widening/repair projects that only involved a traffic shift to one side of the same bridge without any long-term closures.

---

<div class="post-metadata">

**Author:** ![nzahn1](https://www.waze.com/discuss/user_avatar/www.waze.com/nzahn1/32/107693_2.png) [@nzahn1](https://www.waze.com/discuss/u/nzahn1)\
**Post date:** [September 12, 2013, 4:02pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/15 "2013-09-12T16:02:36Z")

</div>

New Dolfield Blvd extension in Owings Mills.   
I noticed some GPS tracks in the WME, but I will go “pave” the new road tonight.

[News Story](http://www.baltimorenewsjournal.com/2013/09/11/new-dolfield-blvd-extension-to-open-to-traffic-with-ribbon-cutting-ceremony/)  
[Image of Changes](https://pbs.twimg.com/media/BT-SMpcIAAAD_RN.jpg:large)  
[PermaLink](https://www.waze.com/editor/?lon=-76.80285&lat=39.42974&zoom=5&layers=TBFTTFTTTTFTTFTTTTTFTTTTFT)

EDIT: I’ve added the new Blvd, and changed the road type to “Primary Road” to reflect its dual carriageway construction, and value as a route from New Town Owings Mills to Reisterstown Road. I’ve also “Un-split” the previous construction of the road per the [guidelines in the Wiki](http://www.waze.com/wiki/index.php/Best_map_editing_practice#How_to_.22Un-Split.22_two_One-Way_Roads).

---

<div class="post-metadata">

**Author:** ![trooster10](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/t/1BAB50/32.png) [@trooster10](https://www.waze.com/discuss/u/trooster10)\
**Post date:** [September 13, 2013, 7:10pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/16 "2013-09-13T19:10:48Z")

</div>

Great work nzahn - I’d bet that Waze is the first to have this on the map! I’ll add the info to the first post.

---

<div class="post-metadata">

**Author:** ![elliottp](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/e/963EFF/32.png) [@elliottp](https://www.waze.com/discuss/u/elliottp)\
**Post date:** [September 19, 2013, 7:28pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/17 "2013-09-19T19:28:47Z")

</div>

> [@trooster10](#):
>
> Great work nzahn - I’d bet that Waze is the first to have this on the map! I’ll add the info to the first post.

It’s been on OSM for a while, we (Baltimore County) built it, so I have had all the centerlines and rights of way on my desk for a couple of years 😃 [http://www.openstreetmap.org/#map=16/39.4301/-76.8039](http://www.openstreetmap.org/#map=16/39.4301/-76.8039)

Good work on the addition in Waze, nzahn1! I don’t expect the other commercial sites to have this one for a while. As you might have noticed, I did some editing work out there earlier this year, in prep for the opening of the road.

---

<div class="post-metadata">

**Author:** ![elliottp](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/e/963EFF/32.png) [@elliottp](https://www.waze.com/discuss/u/elliottp)\
**Post date:** [September 19, 2013, 7:32pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/18 "2013-09-19T19:32:14Z")

</div>

I-83 North JFX 10 month lane closure/construction

I’ve noticed this is set up already. Perhaps we can update the road to construction or something?

[http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation.aspx](http://www.baltimorecity.gov/Government/AgenciesDepartments/Transportation.aspx)

> [@](#):
>
> The Baltimore City Department of Transportation would like to advise motorists that construction work will soon begin along the Jones Falls Expressway. Beginning on or about Monday, September 16, 2013 joint repair work will occur along the Jones Falls Expressway between Fayette and 41st Streets.  
> During construction, nightly lane closures will be implemented along the expressway weeknights from 9:00 p.m. to 5:00 a.m. Double lane closures will occur overnight starting on the southbound Jones Falls Expressway, and as construction progresses, nightly lane closures will also be implemented along the northbound JFX. The lane closures will occur Sunday through Thursday nights and only one lane of through traffic will remain open during these times.  
> In addition to the joint repair work, concrete barriers will also be replaced along a portion of the northbound Jones Falls Expressway. To establish a work zone, a double right lane closure will be installed along the northbound Jones Falls Expressway from Gay to Howard Streets on Monday, September 16 and Tuesday, September 17, 2013 from 9:00 p.m. to 5:00 a.m. each night, weather permitting. Once the work zone is installed, a single lane closure along this section of the northbound JFX will remain in effect for approximately ten weeks.  
> While the concrete barrier work is being performed, the Madison Street/Fallsway on-ramp to the northbound Jones Falls Expressway will be closed to through traffic. This ramp closure will go into effect at 9:00 p.m. on Monday, September 16, 2013 and will remain closed for approximately ten weeks until the barrier replacement is completed.  
> Joint repair work along the Jones Falls Expressway is expected to last approximately nine months. The ramp and lane closures will cause delays and motorists are advised to use alternate routes. Commuters who typically use the Madison Street/Fallsway ramp to access the northbound Jones Falls Expressway may utilize President, Gay, and Charles Streets or North Avenue as alternate routes to reach the JFX. Motorists should also consider using alternate modes of travel including the Light Rail and Metro Subway. Transit information is available by calling 410-539-5000 or at [www.mtamaryland.gov](http://www.mtamaryland.gov).

---

<div class="post-metadata">

**Author:** ![elliottp](https://www.waze.com/discuss/letter_avatar_proxy/v4/letter/e/963EFF/32.png) [@elliottp](https://www.waze.com/discuss/u/elliottp)\
**Post date:** [September 19, 2013, 7:45pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/19 "2013-09-19T19:45:32Z")

</div>

> [@nzahn1](#):
>
> New Dolfield Blvd extension in Owings Mills.   
> I noticed some GPS tracks in the WME, but I will go “pave” the new road tonight.
> 
> [News Story](http://www.baltimorenewsjournal.com/2013/09/11/new-dolfield-blvd-extension-to-open-to-traffic-with-ribbon-cutting-ceremony/)  
> [Image of Changes](https://pbs.twimg.com/media/BT-SMpcIAAAD_RN.jpg:large)  
> [PermaLink](https://www.waze.com/editor/?lon=-76.80285&lat=39.42974&zoom=5&layers=TBFTTFTTTTFTTFTTTTTFTTTTFT)
> 
> EDIT: I’ve added the new Blvd, and changed the road type to “Primary Road” to reflect its dual carriageway construction, and value as a route from New Town Owings Mills to Reisterstown Road. I’ve also “Un-split” the previous construction of the road per the [guidelines in the Wiki](http://www.waze.com/wiki/index.php/Best_map_editing_practice#How_to_.22Un-Split.22_two_One-Way_Roads).

nzahn, the northern section of Featherbed Ln should not continue back to Dolfield Blvd. Here is a screenshot from my workstation: [https://db.tt/iGMPZcNw](https://db.tt/iGMPZcNw) The black line is the centerline. Other colors represent various types of rights of way. Can you verify that section? I have a contact that just told me there shouldn’t be connection, but I haven’t visited the site in a few months.

Thanks,  
Elliott

---

<div class="post-metadata">

**Author:** ![nzahn1](https://www.waze.com/discuss/user_avatar/www.waze.com/nzahn1/32/107693_2.png) [@nzahn1](https://www.waze.com/discuss/u/nzahn1)\
**Post date:** [September 20, 2013, 2:40pm UTC](https://www.waze.com/discuss/t/maryland-construction-projects/46937/20 "2013-09-20T14:40:47Z")

</div>

> [@elliottp](#):
>
> nzahn, the northern section of Featherbed Ln should not continue back to Dolfield Blvd. Here is a screenshot from my workstation: [https://db.tt/iGMPZcNw](https://db.tt/iGMPZcNw) The black line is the centerline. Other colors represent various types of rights of way. Can you verify that section? I have a contact that just told me there shouldn’t be connection, but I haven’t visited the site in a few months.
> 
> Thanks,  
> Elliott

I assume you’re right, but I will do a drive through tonight to make sure. Thanks for the heads up!

[Next page](https://www.waze.com/discuss/t/maryland-construction-projects/46937.md?page=2)