Notícias sobre mudanças no trânsito, publique aqui [GO]

I saw it today on Jornal Anhanguera. Cool that you’ve already added the detour.

BRAZILIAN CHAMPIONSHIP SERIES B (12/04/2026)
Hello Waze Editors! Attention folks in Goiânia and the surrounding region!

The area near the Antônio Acioly Stadium of Atlético Clube Brasiliense will undergo some road closures. The main roads affected are Av. Perimetral and Rua P-25. There are two bases of operations for the closures. According to the Inspection Coordinator of the SET in Goiânia/GO, the various closures are:

Closures by: @mucagba

[quote=“LAERCIO_MIGUEL, post:181, topic:191167”]\nWORKS - MARGINAL BOTAFOGO (FROM 11/04/2026 TO 26/04/2026)\n[/quote]\n\nClosures already applied by editor @mucagba

Exactly!
I asked Laercio to post here. That way, if there are URs, other editors will know what is going on.

ROADWORKS - GO-060 (FROM 24/04/2026 TO 10/05/2026)

Hello Waze Editors! Attention folks in Goiânia/GO and the surrounding region (especially Trindade/GO)!

Sections of GO-060 (Rodovia dos Romeiros), specifically between Km-005 and Km-001, are under construction by GOINFRA, which is resurfacing the road in the Trindade/GO ➤ Goiânia/GO direction. A detour is being routed through the opposing lane. Consequently, all entrances and exits to GO-060 in this direction are blocked.

Here is the PL of the Affected Areas:

Source: GOINFRA - Road Works Directorate

Closure by: @mucagba

MARCH FOR JESUS - May 1, 2026

Hello Waze Editors! Attention folks from Goiânia/GO and region (Mainly the Central Region)!

On May 1, 2026, the March for Jesus will be held, starting from Praça do Avião and going to Praça Cívica.

Below are the PLs for the affected areas:

Source: Municipal Secretariat of Traffic Engineering - SET

Closure reported by: @mucagba

DNIT completes maintenance works on BR-414/GO

“With the completion of the works, the section that was closed (from km 283 to km 300) is open to traffic as of this Wednesday (29).”

Source: DNIT

PS: Closures removed.

Best regards.

ROADWORKS - GO-060 (FROM 02/06/2026 TO 11/06/2026)

Hello Waze Editors! Attention Folks in Goiânia/GO and the surrounding Region!

Sections of GO-060 (Rodovia dos Romeiros), specifically between Km-000 (starting milestone) and Km-002 (more specifically 2.7), are undergoing roadworks by GOINFRA, which is resurfacing the pavement in the Goiânia/GO ➤ Trindade/GO direction. A detour is being routed through the opposite lane. Consequently, all entrances and exits to GO-060 in this direction are blocked.

Below is the PL for the Affected Areas:

Source: GOINFRA - Department of Road Works

Closure by: @mucagba

As posted in the official Waze WhatsApp group.

Here is the news story: Ponte Quinca Mariano será interditada entre MG e GO por um ano | G1

Closure in effect from the 15th until 07/31/27.

I made some adjustments to the date, given that the 15th will still be open under the stop-and-go system, with the full closure starting on 08/01, and I also registered the event on-site.

GOInfra Article

Good afternoon.

The Quincas Mariano bridge, over the Paranaíba River, on the border between Minas Gerais and Goiás, will be completely closed for one year. The start of the closure was scheduled in WME for 08/01/2026, but according to the news the closure will already start on 07/15/2026. We need an L3+ editor with area permissions at the location for the update.

News Link: Ponte Quinca Mariano será interditada entre MG e GO por um ano | G1

Permalink: https://waze.com/pt-BR/editor?env=row&lat=-18.32382&lon=-48.56189&zoomLevel=16&segments=269633041

@bruno_bgo where did you see that it’s 15 days of stop-and-go?

good morning @engton88, the bridge is configured correctly, as I mentioned in the previous post. According to the news from GOINFRA, starting July 15, the bridge will operate under the Stop and Go system, with a full closure starting August 1.

Here is the link to the article again and the excerpt that provides the dates:

:backhand_index_pointing_right: GOInfra Article :backhand_index_pointing_left:

Excerpt providing the dates: Works begin on July 15, with traffic in the stop-and-go system. Total closure will be starting August 1, when the guidance is for drivers to use alternative routes to access the city of Araguari in Minas Gerais

Good morning. Thank you very much for the information. The G1 news report is incomplete then, as it doesn’t mention this Stop and Go period. Thanks!

I always like to check the reports from the agencies that are going to carry out the work or interventions; they tend to be much more detailed than news from media outlets.