Road Closure - Baseline Road at Dry Creek Trailhead Bridge Replacement Project

Hello,

Could someone please add the following Boulder County road closure? I tried to add it, but my editor level isn’t high enough:

Thank you!

2 Likes

Closures added at the bridge until mid-December 2026. If it opens earlier than that, please let us know.

Thank you for taking the time to share this information!!

2 Likes

Thank you!

Please note, the road will be closed all the way from Cherryvale Rd. to 75th St., for local traffic only, not just at the Dry Creek bridge.

See detour map here: Baseline Road - Dry Creek Bridge Replacement - ROAD CLOSURE - Google My Maps

Could you please also adjust the start date? I see it’s active now. This work doesn’t start until March 11th.

This is going to cause a lot of headaches for Nevin Platt Middle School!

1 Like

Looking at a few more project docs, I’ve updated this to reflect the 1-month timeline for phase 1 of this project.

2 Likes

Thank you!

2 Likes

This construction is complete. The road is now open in both directions. Could you please remove this road closure?

Thanks for the follow up!

The closure has been removed.

1 Like