Hi editors,
Need a little help reporting a closure that will take place from Monday, September 8 to December 5 in the town.
- Reason: Redevelopment work source: Saint-André-de-Cubzac Town Hall
- Closure date: 08-09-2025
- Closure time (local time): 06:00:00
- Opening date: 05-12-2025
- Opening time (local time): 18:00:00
- City: Saint-André-de-Cubzac
- Street name: rue Hubert-de-l’Isle
- Permalink: [https://waze.com/fr/editor?env=row&lat=44.99557&lon=-0.44742&zoomLevel=18&segments=63755058,63755057,63756637,63754282]
- Closure direction: both ways
- Periodicity: 24/7
Additionally, during the works, there is a change of direction to be recorded
- Reason: Redevelopment work source: Saint-André-de-Cubzac Town Hall
- Closure date: 08-09-2025
- Closure time (local time): 06:00:00
- Opening date: 05-12-2025
- Opening time (local time): 18:00:00
- City: Saint-André-de-Cubzac
- Street name: rue Soucarros
- Permalink: [https://waze.com/fr/editor?env=row&lat=44.99330&lon=-0.44922&zoomLevel=17&segments=63755597]
- Direction of travel: both ways
- Periodicity: 24/7
thanks in advance