US 2, Snohomish, WA

I am not an area manager and am a level 1 editor. Here’s the segments I’m requesting:

https://www.waze.com/editor/?zoom=5&lat=47.96183&lon=-122.12319&layers=BFTFFTTTFTTFTTFTTTTTTFT&segments=53869574,65390677

The ramp from eastbound US 2 to Bickford Avenue is closed for construction. They have added a small ramp to this segment: https://www.waze.com/editor/?zoom=5&lat=47.96053&lon=-122.12205&layers=BFTFFTTTFTTFTTFTTTTTTFT&segments=65390678 and have made it a two-way road to connect to provide the connection to Bickford Avenue.

Unlocked

Thank you. I think this it is correct now. Or at least a lot closer to correct…