Get a sneak peek at whats next for Permanent Hazards on our April 7th Office Hours!

Post Reply

L5 M19/N2 Ramp

Post by elphix
Will a lvl 5 editor please have a look at THIS report. Judging by the aerials flyovers are under construction. The lock is L5 by Rod so I'm guessing it was on purpose.

Kyle
elphix
Waze Local Champs
Waze Local Champs
Posts: 626
Has thanked: 91 times
Been thanked: 136 times

POSTER_ID:6668793

1

Send a message

Post by elphix
Thanks Rod. I'll keep an eye on this intersection.
elphix
Waze Local Champs
Waze Local Champs
Posts: 626
Has thanked: 91 times
Been thanked: 136 times
Send a message

Post by RodNav
Don't remember why I locked that. It's from January, so I can't blame 'lock-creep' since that was changed by then. I've downlocked to Level 4 so you can fix that restriction. I think we can leave it at 4, since there will need to be changes when the roadworks are done.

Cheers
Rod
PS I should have checked, maybe it was January 2013!
RodNav
Waze Local Champs
Waze Local Champs
Posts: 300
Has thanked: 160 times
Been thanked: 57 times
Send a message
Country Manager for South Africa.
Samsung Galaxy S21 Ultra 5G

Post by RodNav
Oh typical! Now I remember! Due to the construction, that Left turn was not possible when I was in Durban. When? January... :oops:

And the map problem may be using old data, but perhaps it's safer to enable the turn now. We'll soon get URs if I'm wrong (it's been know to happen)

Rod
RodNav
Waze Local Champs
Waze Local Champs
Posts: 300
Has thanked: 160 times
Been thanked: 57 times
Send a message
Country Manager for South Africa.
Samsung Galaxy S21 Ultra 5G