Page 1 of 1

Level 5 - Pittsburg, CA Update Request

Posted: Fri Jan 25, 2013 8:26 pm
by OBgyn_Kenobi
Need the three on/off ramps shown to be connected to Loveridge Road with all turns allowed. Please do not convert this to a two-road configuration as there is construction in progress and the sat image is not representative of the actual geometry. This construction will be in progress at least until the end of 2013.
https://www.waze.com/editor/?lon=-121.8 ... 1,61668592

Thank you in advance.

Re: Level 5 - Pittsburg, CA Update Request

Posted: Sat Jan 26, 2013 1:10 am
by OBgyn_Kenobi
Thank you very much!

Re: Level 5 - Pittsburg, CA Update Request

Posted: Fri Jan 25, 2013 9:51 pm
by txemt
Fixed