I’ve gone through and removed the following projects from the list that appear to be COMPLETED. Please review and let me know if any are still underway.
Saratoga Street Utility Work
Saratoga Street between Charles Street and Liberty Street is closed to westbound traffic for utility work.
Expected Completion: ?
Permalink
Argonne Drive Closure
Argonne Drive is closed to westbound traffic between Loch Raven Boulevard and the Alameda for two weeks. These segments have been changed to one-way eastbound and renamed; this should last for the next two weeks. Then, other segments must be switched to westbound only for an additional two weeks.
Expected Completion: October 24, 2013
Permalink
Press Release
I-83/JFX Elevated Viaduct Repairs
The ramp from Madison Street/Fallsway to I-83 North/Jones Falls Expressway will be closed full-time for 10 weeks, starting September 16, due to construction activities.
Expected Completion: Late November 2013
Permalink
Project Site
Dolfield Boulevard Extension in Owings Mills
Open to traffic - updates to the map have been completed.
News Story
Image of Changes
Permalink
I-695 N/Wilkens Avenue Interchange
Project Completed
Permalink
Project Site
I-70/Security Blvd (MD-122) Interchange
The loop ramp of Exit 94 from I-70 E to Security Blvd N is closed for utility relocation for the Red Line project. The detour on which drivers should be routed is to go around the Park & Ride Lot and take the first westbound ramp.
Expected Completion: November 7, 2013
Permalink
Press Release
News Story
Valley Road
Closed between Wilkens Avenue and Hilltop Road for bridge and roadway repairs.
Expected Completion: December 6, 2013
Permalink
Jordan Sawmill Road Bridge
Jordan Sawmill Road will be closed for bridge repairs.
Expected Completion: November 22, 2013
Permalink
Loflin Road at Philadelphia Road (MD-7)
Part of a larger project involving upgrades at the intersection of Pulaski Highway (US-40) and Philadelphia Road. Loflin Road is closed at Philadelphia Road for utility work.
Expected Completion: Late Summer/Fall 2013
Permalink
Project Site
Pulaski Highway (US-40)/MD-715 Interchange
Upgrades to the existing interchange and modification of traffic movements.
Expected Completion: Early Fall 2013
Permalink
Project Site
East Wheel Road Improvements
Closed between Cedar Lane and Glenangus Drive near Bel Air for reconstruction.
Expected Completion: December 2013
Permalink
Project Site
Old Montgomery Road Bridge
Bridge replacement that has resulted in a full closure of the road.
Expected Completion: December 2013
Permalink
Media Advisory
Traffic Advisory
MD-32/Linden Church Road Interchange
Construction of a grade separation and interchange between MD-32 and Linden Church Rd, which is currently in Stage 3 of construction. This is Phase 1 of a larger project to upgrade MD-32 from a two-lane highway to a four-lane access-controlled divided highway from I-70 to MD-108.
Expected Completion: Late Fall 2013
Permalink
Project Site
Overall Project Site
October Traffic Advisory - YouTube or PDF
Landing Road
Realignment of Landing Road to create a four-way intersection with Ilchester Road and Ilchester Point Court that has resulted in a full closure of Landing Road.
Expected Completion: Early December 2013
Permalink
Project Site
Saratoga Street Utility Work
Saratoga Street between Charles Street and Liberty Street is closed to westbound traffic for utility work.
Expected Completion: ?
Permalink
Argonne Drive Closure
Argonne Drive is closed to westbound traffic between Loch Raven Boulevard and the Alameda for two weeks. These segments have been changed to one-way eastbound and renamed; this should last for the next two weeks. Then, other segments must be switched to westbound only for an additional two weeks.
Expected Completion: October 24, 2013
Permalink
Press Release
I-83/JFX Elevated Viaduct Repairs
The ramp from Madison Street/Fallsway to I-83 North/Jones Falls Expressway will be closed full-time for 10 weeks, starting September 16, due to construction activities.
Expected Completion: Late November 2013
Permalink
Project Site
Dolfield Boulevard Extension in Owings Mills
Open to traffic - updates to the map have been completed.
News Story
Image of Changes
Permalink
I-695 N/Wilkens Avenue Interchange
Project Completed
Permalink
Project Site
I-70/Security Blvd (MD-122) Interchange
The loop ramp of Exit 94 from I-70 E to Security Blvd N is closed for utility relocation for the Red Line project. The detour on which drivers should be routed is to go around the Park & Ride Lot and take the first westbound ramp.
Expected Completion: November 7, 2013
Permalink
Press Release
News Story
Valley Road
Closed between Wilkens Avenue and Hilltop Road for bridge and roadway repairs.
Expected Completion: December 6, 2013
Permalink
Jordan Sawmill Road Bridge
Jordan Sawmill Road will be closed for bridge repairs.
Expected Completion: November 22, 2013
Permalink
Loflin Road at Philadelphia Road (MD-7)
Part of a larger project involving upgrades at the intersection of Pulaski Highway (US-40) and Philadelphia Road. Loflin Road is closed at Philadelphia Road for utility work.
Expected Completion: Late Summer/Fall 2013
Permalink
Project Site
Pulaski Highway (US-40)/MD-715 Interchange
Upgrades to the existing interchange and modification of traffic movements.
Expected Completion: Early Fall 2013
Permalink
Project Site
East Wheel Road Improvements
Closed between Cedar Lane and Glenangus Drive near Bel Air for reconstruction.
Expected Completion: December 2013
Permalink
Project Site
Old Montgomery Road Bridge
Bridge replacement that has resulted in a full closure of the road.
Expected Completion: December 2013
Permalink
Media Advisory
Traffic Advisory
MD-32/Linden Church Road Interchange
Construction of a grade separation and interchange between MD-32 and Linden Church Rd, which is currently in Stage 3 of construction. This is Phase 1 of a larger project to upgrade MD-32 from a two-lane highway to a four-lane access-controlled divided highway from I-70 to MD-108.
Expected Completion: Late Fall 2013
Permalink
Project Site
Overall Project Site
October Traffic Advisory - YouTube or PDF
Landing Road
Realignment of Landing Road to create a four-way intersection with Ilchester Road and Ilchester Point Court that has resulted in a full closure of Landing Road.
Expected Completion: Early December 2013
Permalink
Project Site
Re: Maryland Construction Projects