West Dowling Expansion Phase II Anchorage Topic is solved
Posted: Mon Nov 09, 2015 7:40 pm
I have another new road extension for review, ribbon cutting was 8 NOV 2015.
The intersection of Rasberry Rd and W Dowling Rd is my major concern. The intersection does not allow traffic from Rasberry Rd to cross W Dowling directly into the Changepoint parking lot and vice versa. Dowling Traffic can pass straight through but can't turn left directly into the parking lot or from the other direction onto Rasberry Rd. Instead they must pass through the intersection then turn left across two lanes on to the "ramps."
Link to the Rasberry/Dowling/Changepoint parking lot diagram:
https://www.uaa.alaska.edu/civilenginee ... phase2.cfm
Link to the final design plans:
https://www.uaa.alaska.edu/civilenginee ... -21-10.pdf
Permalink:
https://www.waze.com/editor/?env=usa&lo ... ,500358124
The intersection of Rasberry Rd and W Dowling Rd is my major concern. The intersection does not allow traffic from Rasberry Rd to cross W Dowling directly into the Changepoint parking lot and vice versa. Dowling Traffic can pass straight through but can't turn left directly into the parking lot or from the other direction onto Rasberry Rd. Instead they must pass through the intersection then turn left across two lanes on to the "ramps."
Link to the Rasberry/Dowling/Changepoint parking lot diagram:
https://www.uaa.alaska.edu/civilenginee ... phase2.cfm
Link to the final design plans:
https://www.uaa.alaska.edu/civilenginee ... -21-10.pdf
Permalink:
https://www.waze.com/editor/?env=usa&lo ... ,500358124