District of Columbia Construction Projects

Post by syborg_sasquatch
This is a list of construction projects in the District of Columbia that are major enough to require changes to the map. The goal of this thread is to coordinate our edits in response to the changing road conditions on the ground especially since satellite imagery and GPS points may not reflect current conditions.

Due to the delay before edits to go live, projects and closures expected to last less than two weeks should be discussed here before editing the map.

Post here to report a construction project - I will add it to the list in order of completion date and acknowledge your post by marking it with "thanks". Also, please notify me of any incorrect or missing information, or upon the completion of a project.

The DDOT Project Dashboard is located here.

The list of active DC Water projects is located here with press releases located here.

Please be aware that a discussion is occurring in this thread in the Wiki Updates and Discussion Forum regarding how to label roads that are closed or under construction.

LAST UPDATED: 3/28/2014

-------------------------------------------------

Infrastructure Improvements on First Street NE

The project will rebuild the entirety of First Street, NE and its sidewalks from G Street, NE to New York Avenue, including significant improvements to the side streets of K, L, Pierce, M, Patterson, and N Streets, NE. First Street between K Street and New York Avenue will be one-way southbound only during the entire period of construction. All northbound traffic will be detoured to North Capitol Street. After construction is finished, First Street will be returned to two-way traffic with an added two-way cycle track along the east side of the street and on-street parking along the west side.
  • First Street NE between K St NE and New York Ave is one-way southbound.
Expected Completion: February 2014
Permalink
Project Site

-------------------------------------------------

McMillan Stormwater Storage Project
DC Water will construct two underground structures to divert stormwater into a temporary holding tank within the McMillan Sand Filtration Plant and existing trunk sewer. The two diversion structures at North Capitol Street and First Street will work together with the retention basins along Irving Street to delay approximately 4.5 million gallons of stormwater from reaching the Bloomingdale and LeDroit Park neighborhoods during heavy rainfall events.

The second phase of the project is currently underway, and includes work on North Capitol Street, First Street and Irving Street.
  • First Street NW between Channing Street NW and Michigan Avenue NW is closed.
Expected Completion: July 2014
Permalink
Project Site
Feb 7, 2014 Press Release

-------------------------------------------------

DC Clean Rivers Project - M Street Diversion Sewers
DC Water, in coordination with the District Department of Transportation, will implement a temporary traffic pattern change on M Street, SE as part of the Anacostia River Tunnel Project which is part of the DC Clean Rivers Project. Crews will construct the upper section of an approach channel that will be used to convey storm water to the new Anacostia River Tunnel. Crews will also begin excavation of Combined Sewer Overflow outfall #017.
  • M Street SE is closed between the traffic circle at Maritime Plaza and Water Street SE.
  • M St SE has lane shifts between 7th St SE and 11th St SE.
Expected Completion: December 2014
Permalink
Anacostia River Tunnel Project Site
M Street SE Project Information Sheet
July 22, 2013 Press Release
Sept 13, 2013 Press Release

-------------------------------------------------

Bryant Street Pumping Station Discharge Piping Replacement Project
The District of Columbia Water and Sewer Authority (DC Water), in coordination with the District Department of Transportation (DDOT), has begun the construction and replacement of large transmission mains on Bryant Street NW from 2nd Street to 4th Street NW. Crews will replace more than 5,100 feet of large water pipelines that distribute water from the Bryant Street Pumping Station to District residents.
  • Bryant St NW is closed to thru traffic between 2nd Street NW and 4th Street NW.
Expected Completion: July 2015
Permalink
Project Site
Project Information Sheet
March 7, 2013 Press Release

-------------------------------------------------

11th Street Bridge
DDOT began construction of 11th Street Bridge Project in December 2009 to replace the two existing bridges with three new bridges and improve the related interchanges.

This project is currently in Phase II which is intended to further improve connections between the Southeast-Southwest Freeway and Virginia Avenue SE with the new outbound 11th Street Freeway Bridge, as well as boulevard connections between 11th Street and Pennsylvania SE.
  • 'N' St SE closed between 11th St SE and 12th St SE.
  • Exit to 8th St SE from I-695 W is closed
Expected Completion: Mid 2015
Permalink
Project Site

-------------------------------------------------
syborg_sasquatch
Posts: 160
Has thanked: 70 times
Been thanked: 41 times

POSTER_ID:16852483

1

Send a message
Chuck H. | Rank 3 Editor
Samsung Galaxy S4 | Android 4.2.2 | Waze 3.7.8
DC Wiki | MD Wiki | VA Wiki

Post by mdswbkq
Linnean Avenue NW is closed for park construction between Broad Branch Rd NW and Linnean Ter NW, ID: 9293529

Davenport St NW is closed for road construction between Broad Branch Rd NW and Linnean Ter NW, ID: 62705502
mdswbkq
Map Editor - level 3
Map Editor - level 3
Posts: 72
Has thanked: 19 times
Been thanked: 7 times
Send a message
AM: Central Maryland

Post by mdswbkq
The two are separate projects. I wasn't able to find any timing information on either one. The Linnean Avenue closure is due to a project that will "daylight" or un-bury a stream in parkland, and they need to dig up Linnean Avenue to install pipes, which will in turn require work on the water main. The Davenport Street closure involves creation of a sidewalk on a narrow, twisted road above a stream gully. It's probably safe to assume several months for each.

The Linnean Avenue project is primarily run by the DC Department of the Environment, with involvement by multiple other agencies, as well as the National Park Service. The latter's site for the project is http://parkplanning.nps.gov/projectHome ... ctID=36858.

I haven't been able to find a site for the Davenport Street project.
mdswbkq
Map Editor - level 3
Map Editor - level 3
Posts: 72
Has thanked: 19 times
Been thanked: 7 times
Send a message
AM: Central Maryland

Post by mdswbkq
Both street closings (Linnean Ave NW and Davenport St NW) are finished.
mdswbkq
Map Editor - level 3
Map Editor - level 3
Posts: 72
Has thanked: 19 times
Been thanked: 7 times
Send a message
AM: Central Maryland

Post by russblau
mdswbkq wrote:Linnean Avenue NW is closed for park construction between Broad Branch Rd NW and Linnean Ter NW, ID: 9293529

Davenport St NW is closed for road construction between Broad Branch Rd NW and Linnean Ter NW, ID: 62705502
Do you have closure begin/end dates? Also, if available, a link to the project website would be helpful.
russblau  
State Manager
State Manager
Posts: 1802
Answers: 1
Has thanked: 361 times
Been thanked: 681 times
Send a message

Post by syborg_sasquatch
Updated to reflect:

DC Clean Rivers Project - M Street Diversion Sewers
  • 9th St SE between L St and M St is now open
11th Street Bridge
  • Exit to 8th St SE from I-695 W is now closed
syborg_sasquatch
Posts: 160
Has thanked: 70 times
Been thanked: 41 times
Send a message
Chuck H. | Rank 3 Editor
Samsung Galaxy S4 | Android 4.2.2 | Waze 3.7.8
DC Wiki | MD Wiki | VA Wiki