The restriction were lifted 2 days ago, the problem was that some segments were disconnected to ensure no possible routing through the bridge North deck.
I have reconnected the segments and removed the two way on the south deck, turning it back to one way.
Everything looks OK on my end, but would be great if you could check to see if I missed anything.
It will take 2-3 days to reflect the edits in the App.
Cheers,
HM.
I have reconnected the segments and removed the two way on the south deck, turning it back to one way.
Everything looks OK on my end, but would be great if you could check to see if I missed anything.
It will take 2-3 days to reflect the edits in the App.
Cheers,
HM.
Re: LEVEL 5 - Mercier Bridge