[COMPLETED] Whitchurch Bridge, Pangbourne

Forum for documenting changes to the map during roadworks.
Please read "How to use the UK Roadworks sub-forum" before writing a thread.

Moderators: Unholy, Timbones

[COMPLETED] Whitchurch Bridge, Pangbourne

Postby ditchi56 » Tue Nov 19, 2013 12:47 pm

Permalink: https://www.waze.com/editor/?zoom=6&lat=51.48671&lon=-1.08495&segments=121903489&env=row

Description: Bridge is closed for demolition and reconstruction, originally scheduled to reopen April 2014, currently scheduled to reopen September 2014.

Links: http://www.whitchurchbridge.com

Editing Actions Taken: Time restrictions used to close the bridge until 14 April 2014.

How To Finish The Roadworks: The time restriction will expire automatically, but should be deleted for clarity.

Anything Else: I'm monitoring the bridge company's website (link above) for updates on progress.

Since tolls are only charged for this bridge during the day, I've also split it into two, so that Waze won't flag a toll overnight when it reopens. I've used the method that Iain House has pioneered for the London Congestion Charge Zone https://www.waze.com/forum/viewtopic.php?f=55&t=67951&start=50#p609648. Of course, this means that the closure restriction has to appear four times, 2 segments x 2 directions.
Last edited by ditchi56 on Fri Sep 26, 2014 12:46 pm, edited 2 times in total.
ditchi56
Country Manager
Country Manager
 
Posts: 2038
Joined: Tue May 29, 2012 12:35 pm
Has thanked: 284 times
Been thanked: 740 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby ditchi56 » Tue Nov 19, 2013 3:16 pm

iainhouse wrote:I haven't quite pioneered it yet! :lol: Still waiting for one more test

OK, please let me know if you turn up any problems. Doesn't matter for Whitchurch Bridge until April!
ditchi56
Country Manager
Country Manager
 
Posts: 2038
Joined: Tue May 29, 2012 12:35 pm
Has thanked: 284 times
Been thanked: 740 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby ditchi56 » Fri Mar 14, 2014 8:41 am

Whitchurch Bridge re-opening now deferred until September 2014 "at least". Original post edited.

However I haven't been within four miles of the bridge for a while, and can no longer edit the time restriction. Would someone else like to take over?
ditchi56
Country Manager
Country Manager
 
Posts: 2038
Joined: Tue May 29, 2012 12:35 pm
Has thanked: 284 times
Been thanked: 740 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby ditchi56 » Fri Aug 29, 2014 6:11 am

We have a reopening date - Friday 26 September. Still provisional, but at least they've felt confident enough to name a day. I now have edit rights again, so have updated the restrictions to terminate at midnight on 25 September.
Ian
ditchi56
Country Manager
Country Manager
 
Posts: 2038
Joined: Tue May 29, 2012 12:35 pm
Has thanked: 284 times
Been thanked: 740 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby ditchi56 » Mon Sep 15, 2014 3:35 pm

Bridge is reopening at 5pm on Friday 19th September, and will then be toll-free until 24th September.

On Waze, there are two bridge segments. There's a toll segment which will, once the bridge reopens, have no time restrictions. And a toll-free segment which will be restricted to be open only when the bridge is toll-free.

I've set up the toll-free segment to be unrestricted from 5pm on the 19th September; sometime between 20th & 23rd September I'll come back and set up the on-going restrictions.

Ian
ditchi56
Country Manager
Country Manager
 
Posts: 2038
Joined: Tue May 29, 2012 12:35 pm
Has thanked: 284 times
Been thanked: 740 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby iainhouse » Tue Nov 19, 2013 2:06 pm

ditchi56 wrote:I've used the method that Iain House has pioneered for the London Congestion Charge Zone


I haven't quite pioneered it yet! :lol: Still waiting for one more test (and, of course, there's a delay in updates for the INTL tiles). I do not want to mess up the London CCZ!
UK Country Administrator
AM: London (DELETED), S Wales
Waze 3.7.3 • iPhone 4S (iOS 6.1.3) • Chrome/XP
Community Champ
ImageImage
UK WikiWaze FAQ
My name is Iain and I'm a Wazaholic. I last edited 1 hour ago.
iainhouse
Country Manager
Country Manager
 
Posts: 3810
Joined: Mon Jul 23, 2012 5:16 pm
Location: on the road from London to insanity
Has thanked: 663 times
Been thanked: 1888 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby theMadcabbie » Sat Apr 05, 2014 4:40 pm

HI All,

I have cleared down all restriction and reset the closure date until September 2014.

Once the road re-opens I will put in place all the appropriate restrictions as detailed above.

In the meantime any q's please PM me.

KR
Mark
Mark
The Madcabbie
Hungerford's Top Taxi Company
ImageImage
AM for Hungerford to Slough - The IOM & Shetland Islands
waze@hungerford-cabs.co.uk
theMadcabbie
 
Posts: 206
Joined: Tue Jul 09, 2013 12:17 am
Location: Hungerford
Has thanked: 133 times
Been thanked: 34 times

Re: [IN PROGRESS] Whitchurch Bridge, Pangbourne

Postby theMadcabbie » Fri Aug 29, 2014 10:54 am

Hi Ian

Hope your well

I will put it in my diary to drive the route on the 26th so we know for sure.
Mark
The Madcabbie
Hungerford's Top Taxi Company
ImageImage
AM for Hungerford to Slough - The IOM & Shetland Islands
waze@hungerford-cabs.co.uk
theMadcabbie
 
Posts: 206
Joined: Tue Jul 09, 2013 12:17 am
Location: Hungerford
Has thanked: 133 times
Been thanked: 34 times


Return to Roadworks

Who is online

Users browsing this forum: No registered users