Post Reply
Forum rules
The place to ask for help when editing in the UK.

Map Editing Guidelines . Join the UK Discord Server

Dealing with Road Closure Requests (MP)

Post by
Road Closure Requests are a new type of Map Problem that are automatically imported into the editor from Elgin. Here's what you should do with them...
A170.png
First, attempt to verify if they are valid, and maybe get some more accurate details about the location, direction and duration. The reports from Elgin (also Roadworks.org.uk) are mostly spot on, although often claim the closure is for an entire day rather than just working hours.

If the closure request is bogus, for example on a cul-de-sac, non-drivable road or lane closure, then mark it as Irrelevant data. This feedback will be passed back to the feed provider so they can improve their information.

If you have necessary permissions to set closures on the relevant segments, then go ahead and set the closure. If you don't have permissions, then you can pass the request up to a higher editor to implement for you, as per this thread. Remember to include all the information needed to set the closure.

Further tips:
  • The UR/MP Tracker extension can show you all the closure requests in your area.
  • If the segment needs splitting, and the closure starts more than a week in the future, you can probably get away with it as long as you remember to come back after the map has updated.
    Otherwise, you'll have to figure out which segments are best to close.
  • Daytime or overnight closures that repeat over several days are easier to apply via the Closures sheet.
Addendum: Requests from TrafficMaster will no longer appear in WME.

POSTER_ID:1445148

1

Send a message

Post by atrophicshiner
And to add to that, if you do spot MPs that have not been actioned (with the time fast approaching), do feel free to highlight this in the Editor Request forum, L3+s do try and add closures, but can get backlogged when no able to review them for a day or two, especially as many can require further investigation as ELGIN can be vague at best.

I promise any badgering to add closures won't be frowned upon :D
atrophicshiner
Waze Local Champs
Waze Local Champs
Posts: 6000
Answers: 8
Has thanked: 1603 times
Been thanked: 2329 times
Send a message
- Chris - (Catching up with the Ia{i}ns one Chris at a time)

https://cottagepi.uk/proud-wazer.gifhttps://cottagepi.uk/pirate.pnghttps://cottagepi.uk/Beta_app.pnghttps://cottagepi.uk/tolls.pnghttps://cottagepi.uk/Iain.png
UK Local Champ would you believe
AM the Middle bit of England
Usability | Simplicity | Retention

Post by ditchi56
iainhouse wrote:please make sure you have the live users layer active and you are visible when you are working on closures
Just in case someone else is unaware of what this means, you need both "live users" checked in the layers drop-down and "visible" in the chat room box (although you don't need to have the chat room box open).
ditchi56
Country Manager
Country Manager
Posts: 6468
Answers: 5
Has thanked: 1717 times
Been thanked: 2768 times
Send a message

Post by iainhouse
A couple of weeks ago, we had a major batch of these closure MPs appear. I did practically nothing else last week and have probably dealt with about 700 closure MPs over the last 2 weeks. So I'll share a few thoughts from my experience.

Small closures in long segments. Often these closures are at bridges/underpasses. As said above, if the closure isn't for a few days, you have a chance to split the segment and set the correct elevations. Whilst you're at it, I would advise doing the same for any other bridges you see nearby. Rail bridges, in particular, often have maintenance work or scheduled inspections. If you split them now, it will be much easier next time there's a closure. Plus, it drives me crazy when I see a 1 mile segment at elevation -1 because 30 yards of it goes under a dual carriageway! :twisted:

If a closure in a long segment isn't at a bridge, it may not be worth splitting it. Another editor may come along later and remove the split anyway. Most of these tend to be in rural areas anyway. Consider who you're implementing a closure for: is it a very small number of local visitors, or for people who would otherwise be routing through here on the way elsewhere? If there are few destinations on the long segment, perhaps you can just close the whole thing?

Roadworks.org is Elgin: every closure MP will have details from roadworks.org. But to find them, you may need to select a few extra things from their layers menu:
  • Live Incidents: Road closures
  • Road closures & diversions: Road closure, Diversion route (helps you visualise what's going on), Bridge closure
  • Traffic restrictions: Road closure crossing
  • Public events: All of them. Many of these closure MPs are for special events
Don't forget to view roadworks for, at least, the next 2 weeks. It defaults to "today" and keeps changing back to that! Often, the detail popups for the icons will have links to useful documents like Traffic Restriction Orders. Sometimes the closure icon won't have details, but there will be an associated roadworks icon that does.

Cul-de-sacs. I need to slightly disagree with Tim. :shock: You don't necessarily have to add these closures - their effect on Waze routing is truly minimal. But I wouldn't mark them as irrelevant - if they are correct, why effectively "mark down" the data supplier?

Hertfordshire CC have a really bad habit. They publish a load of closures along the lines of "Closed for 2 days within this 20 day period from micro-surfacing". What can you do? Mark them as irrelevant and move on. :(

Duplicate MPs. Some of the big batch of closures were duplicated. Whether that will be an ongoing thing I don't know, but keep an eye out for second closure MPs directly under the first one.

Times The MPs almost all state a time of 00:00 to 23:59. I'm sure that's because the closure times are not included as an available part of the structured data. Even if roadworks.org has the times, they are often in the text description. Generally speaking, I start closures at 6am (assuming they may close the road an hour or two before starting work) and end closures at 8pm (allowing time for finishing a bit late). If a closure is Monday to Monday, I sometimes assume that, because it apparently includes weekend working, the closure is aimed to finish in time for Monday morning traffic - particularly if it's a major road. In those cases, I set an end time of 6am Monday. These are all guesses - feel free to make your own. :D
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by iainhouse
PealRinger wrote:Are some Elgin road closure now being added automatically?

I was just looking at this request in Eastgate Street, Southampton and then realised that the closure is already there, apparently without an real editor approving?
closure.jpg
This has not been added directly - try refreshing your browser and you'll see who added it - with several errors:
  • Start & end times set to 0:00 - it's very unlikely they will start & finish work at midnight. I would set 7am-7pm (since the nights are starting to draw in)
  • End time set to 00:00 on the last date listed by Elgin - so guaranteed not to be closed at all for the last day of working.
  • Entire Elgin description copied into closure - useless for the app. "Cabling works" would be appropriate.
  • MP not closed.
Advice for closures is in the post previous to yours. :)
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by iainhouse
I'd like to suggest we take a bit more care with closures.

One of the reasons they take some time to get through (for me at least) is that I invariably find mistakes in the area or even on the roads I'm closing: missing names missing roads, badly-aligned junctions. If you think it's worth closing a road to provide a benefit to Waze users, then isn't it worth correcting the obvious mistakes that will benefit them for far longer than the week or two the road might be closed?

Of course, you have to be careful with any corrections you make before adding a closure, in case you split or delete a segment that you need to close. I've caught myself out several times this way.

I have a rapidly-growing list of places I've bookmarked that need more work. If I ever get through this latest batch of closures there will be quite a few places where routing will be improved.

Also, if you decide to split a segment (say at a bridge) ready for a closure that's some distance in the future, please drop a [NOTE] UR there to say what you've done. It's quite irritating to enter a closure only to find that, when you hit save, WME can't find the segment to close. :lol:
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by iainhouse
hublander wrote:...since I can't do road closures in all my editable area.
We're all aware of the problems with authorising closure areas, since Waze will not accept an AM area, only a permalink. Whinging about it here won't help. I'd rather hear from editors who do want to help than those who aren't going to.

In the meantime, as a reminder to all editors please make sure you have the live users layer active and you are visible when you are working on closures. That way other editors won't waste time working on a closure, only to get a save error because someone else has duplicated the effort. :evil:
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by iainhouse
I seem to have been doing little else but closures for weeks now. UR-MP stats tell me there are currently 629 closed MPs in the UK, of which I've closed 507. I've probably done 1500-2000 closure MPs in the last month or two. As I continue to get more experience of these closures, I thought it's time to share some more knowledge. :geek:

Most importantly, many closures that appear to run continuously for a number of days do not, in fact, do so. Some are overnight only, or off-peak daytime only. I have to say that for most closures, it is necessary to check the details on roadworks.org, rather than taking the details in the MP at face value.
  • The A and B points are fine if it's a simple road that's closed. If you have, say, an area of roads closed for an event, the position of A and B may be pretty meaningless. Check the red closure lines on roadworks.org if there is any doubt.
  • The MP marker is always mid-way between the A & B points. If you find an MP in the middle of a field, it might be for the closure of 20 miles of B road!
  • Closures to major roads or long segments are often not 24/7. The bigger a road, the more likely it will be overnight or off-peak closures.
  • "Carriageway patching" mean pretty much what it says - fixing patches of road surface. This is often done during off-peak daylight hours, leaving the road open for rush hours, overnight and weekends
  • Resurfacing can be done in sections allowing traffic through in between times. Again, major roads may have resurfacing like this. Rural roads, or roads where there is an easy diversion route are more likely to close 24/7
  • "Micro-surfacing" is still re-surfacing. It just means skimming off & re-laying the top layer of tarmac. It's cheaper, but still closes the road
  • Most utility works (gas main, water main, sewer, telecoms duct etc) involve digging up the road. These will generally be 24/7 closures...
  • ...unless the details say "working in the footway/verge". In that case, the closure is for the safety of men & equipment and the road may be open outside the working hours
  • "Communication pipe" is nothing to do with BT! It seems to be a term referring to the pipes that come off of a water main/sewer/gas main etc going towards properties. So a "burst communication pipe" does not mean someone tried to download too much porn. :lol:
  • Please keep the description brief & meaningful. You don't need to copy in the whole MP text.
  • Level crossing closures are almost always overnight at a weekend
  • Related to that, closures may not run from the start date to the end date continuously. If you see a level crossing closure for 3 weeks, for example, often the actual closures are for the Saturday night during those 3 weeks only
Lastly, and most importantly, if you are not sure about a closure MP please leave it! I'm fine with closing the MPs for closures on dead-end segments - adding the closure will make no difference to routing. But if you find a closure in the middle of nowhere and you don't feel it's worth actioning, just leave it. I will get to it sooner or later and do it. Some MPs get re-posted 2 or 3 times and I've found MPs re-appear for some major road closures that were never actioned, right next to closed MPs.

Of course, if you've really searched and you cannot find enough details to action a closure, then close the MP. I've done over 100 closures for Remembrance Day Parades. Some councils give great info. Cheshire, on the other hand, give no closure times at all. Some of their closures I've managed to do by finding details on local websites, but some I've just had to close unsolved because I just can't find the details.
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by iainhouse
If you are doing closures in Devon, please be aware: they are posting a lot of closures for a long period. When you check the details on Roadworks.org (you are checking, aren't you? ;) ), there will be an attached PDF with more likely dates covering a much shorter period.

For example, closure has dates 12th-25th April. PDF says the closure is 12th-16th, which is much more likely for the length of road being resurfaced.
iainhouse
EmeritusChamps
EmeritusChamps
Posts: 11143
Answers: 1
Has thanked: 2173 times
Been thanked: 8188 times
Send a message
https://storage.googleapis.com/wazeoped ... c4/AGC.pnghttps://sign.waze.tools/s2000.pnghttps://sign.waze.tools/c6.png
My scripts: WME FixUI WME Presets :ugeek:
I want to go to a commune in Vermont and deal with no unit of time shorter than a season

Post by Kkervinjones
Kpow99 wrote:Someone has put in road closures along a long section of road but in fact is only one small section! How do I get this information removed from Waze as it is making some crazy diversion that isn't possible?!!
It would be useful it you let us know where this issue is. Please following the posting guideline and post in the UK Editor Request sub-forum, and a capable editor will be able to help.
Kkervinjones
Waze Global Champs
Waze Global Champs
Posts: 4077
Answers: 11
Has thanked: 1118 times
Been thanked: 1661 times
Send a message
Keith
UK Country Admin and Global Champ
Area Manager for North West England and the Isle of Man
Google Pixel 5 (Personal)/iPhone 8 (Work) - Carplay/AA - 2021 Toyota Corolla

https://s.waze.tools/gc.pnghttps://s.waze.tools/c6s.pnghttps://s.waze.tools/s0500.pnghttps://s.waze.tools/betc.pnghttps://s.waze.tools/beta.pnghttps://s.waze.tools/tem.png
https://i.imgur.com/nW244c6.png

Post by Kpow99
Someone has put in road closures along a long section of road but in fact is only one small section! How do I get this information removed from Waze as it is making some crazy diversion that isn't possible?!!
Kpow99
Posts: 1
Send a message