Switch to full style
1. Include the city and state in the "Subject:" line of your post
2. Include a Permalink to the segment(s) you wish to unlock or have updated
3. Provide a short explanation of why you need the unlock or update done.
4. Thank the user who solved the request and mark the thread Solved.

Please note that a higher level editor may choose to fix an unlock request themselves so higher value segments will remain protected at their level.

Forum rules

1. Include the city and FULL state name in the "Subject:" line of your post
2. Include a Permalink to the segment(s) you wish to unlock or have updated
3. Provide a short explanation of why you need the unlock or update done.
4. When completed, THANK the user who solved the request and mark the thread SOLVED.
Post a reply

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Thu Dec 12, 2019 7:27 pm

I'll follow up with the PTC on these issues.

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville  

Fri Dec 13, 2019 1:12 am

The PTC reported that there have been no changes to Exit 31 NB or SB and everything there is signed and configured correctly at present.

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Sat Dec 14, 2019 1:07 pm

I'll double-check with the PTC, but they told me nothing has changed.

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Sat Dec 14, 2019 2:54 pm

I agree we need to have the correct exit name, so I'm double checking with PTC about it. If you saw 31B, then there is definitely something going on that we need to correct.

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Tue Dec 17, 2019 7:03 pm

To finish this, the PTC did confirm the exit name change, so I have corrected 31 to read 31B southbound.

Level5 Update: Pennsylvania - Kulpsville/Harleysville

Thu Dec 12, 2019 3:24 pm

My level: 3

The name of this ramp off of the southbound I-476 PA Turnpike Northeast Extension needs to be changed from "Exit 31" to "Exit 31B" per the UR also PL'd. Would prefer this verified by BOTG first since the SV is old and does not reflect recent construction on the Turnpike in this area.

On the northbound side, Exit 31A is an EZ-Pass only offramp and Exit 31B is an offramp with a full-service toll booth, both serving SR-63. The southbound side does not have an EZ-Pass Only offramp but it does have an EZ-Pass Only onramp. There may be plans (check with the PTC) to construct an EZ-Pass Only offramp here as Exit 31A.

https://www.waze.com/en-US/editor?env=u ... st=8692235

Thanks!

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Fri Dec 13, 2019 3:11 am

Thanks, Russ. I informed the Wazer by means of a UR comment and closed the UR.

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Sat Dec 14, 2019 4:16 am

RussPA wrote:The PTC reported that there have been no changes to Exit 31 NB or SB and everything there is signed and configured correctly at present.


BOTG tonight: the exit signage on the southbound side say "Exit 31B." Unfortunately, I've already closed the UR. The ramp name should be changed to match the new signage, shouldn't it?

Re: Level5 Update: Pennsylvania - Kulpsville/Harleysville

Sat Dec 14, 2019 2:14 pm

RussPA wrote:SV from 6-2019 shows "Exit 31", I'll double-check with the PTC, but they told me nothing has changed.


Last night I was going northbound and out of curiosity looked behind me when I passed the southbound sign. It looked like a brand new sign and definitely said Exit 31B. This was right at the southbound off-ramp.

The exit ramp *configuration* might not have changed but the *signage* has. If PTC thinks their contractor made a mistake, then maybe keep it exit 31 because they might have the sign corrected... BUT we definitely should be matching the signage for ramp names.
Post a reply