56 Miles of median cable work I-94 from IN state line.

Moderators: delilush, SkiDooGuy, TerryPurdue, GizmoGuy411

Re: 56 Miles of median cable work I-94 from IN state line.

Postby txemt » Sat Jul 05, 2014 5:14 am

nnote wrote:If there's no closures, I dont see a need for any action. If there's construction slowdowns waze will detect it and re-route if needed.


I'm with nnote on this one.
Just wazeting my time to help you waze your route smoothly.
txemt
 
Posts: 4772
Joined: Tue Jul 17, 2012 7:03 pm
Location: 26.1901 80.3659
Has thanked: 42 times
Been thanked: 1034 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby nnote » Fri Jul 04, 2014 8:02 pm

If there's no closures, I dont see a need for any action. If there's construction slowdowns waze will detect it and re-route if needed.
USA Territories Regional Coordinator : USA Champ : L6 State Manager Arizona
Image
G+ Waze Arizona
Waze Arizona Twitter
nnote
US Waze Champs
US Waze Champs
 
Posts: 587
Joined: Sun Jun 19, 2011 6:25 pm
Location: Arizona USA
Has thanked: 68 times
Been thanked: 300 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby jdeyoung » Tue Jul 08, 2014 6:20 pm

Marking that long a section for only periodic and localized interruptions seems more like "error someplace". To me - construction zone implies loss of lanes/cross-overs for days/weeks at a time for long sections. And even for that, it only matters if traffic slows and you can be re-routed. The corridor of I-80/94/196 from IL to SW MI is notorious for those kinds of behaviors. Areas where work will be done are more equivalent to the temporary "mowing next X miles". When you see it, you know it and then move on - even if a temporary loss of lane is involved. Those are better reported as road hazards more precisely where the work is interfering with traffic.
Image
AM Chicago, NW Indiana, SW Lower MI
jdeyoung
 
Posts: 466
Joined: Tue Jun 07, 2011 10:04 pm
Location: Greater Chicago Metro area, NW Indiana, SW Lower MI, USA
Has thanked: 29 times
Been thanked: 201 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby jasonh300 » Sat Jul 05, 2014 4:56 am

CBenson wrote:I'm not sure what labeling a freeway as a construction zone does. A "I-94 (Construction Zone)"


Adding Construction Zone to an Interstate name will probably break the shields, since that name isn't in the shields database. And in past experience, if you break the shield, you may not get it back when you rename it back to I-94.

The eternal slower speed should keep the road red all the time, and drivers will probably post reports. If there's no viable alternative route (Major or Minor Highway without adding significant route length) when the road is red due to slow speeds, routing isn't going to change anyway. The Construction Zone note isn't going to help much since you won't see it until you're on it.
jasonh300
EmeritusChamps
EmeritusChamps
 
Posts: 7568
Joined: Fri Oct 28, 2011 4:26 pm
Location: New Orleans, LA, USA
Has thanked: 407 times
Been thanked: 976 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby hitfactor » Fri Jul 04, 2014 7:51 pm

This wiki on Construction Zones has a section - major construction without closure. Here it recommends appending (Construction Zone) to the road name and adjusted the road as required.

https://wiki.waze.com/wiki/Construction ... ction_zone.


I have another pending unlock request for I-94 construction here : https://www.waze.com/forum/viewtopic.php?f=622&t=98671
hitfactor
 
Posts: 77
Joined: Tue Apr 15, 2014 10:05 pm
Location: Berrien County, Michigan, U.S.A.
Has thanked: 24 times
Been thanked: 24 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby hitfactor » Wed Jul 02, 2014 8:57 pm

Here is a link to the MDOT construction map.

http://www.michigan.gov/documents/mdot/ ... 0547_7.pdf
hitfactor
 
Posts: 77
Joined: Tue Apr 15, 2014 10:05 pm
Location: Berrien County, Michigan, U.S.A.
Has thanked: 24 times
Been thanked: 24 times

56 Miles of median cable work I-94 from IN state line.

Postby hitfactor » Wed Jul 02, 2014 8:37 pm

I-94 from the Indiana State Line to mile marker 59 (Paw Paw is exit 60) is a construction zone as median cable is installed and signs are replaced.

As the work crews move they normally close the left hand lane, dig post holes, clean up the dirt and move to a new area. In other words, the lanes change frequently. However, for the most part all lanes are open over this stretch.

Should I create an unlock request and label all 56 miles as a construction zone?

This is project 62 on the MDOT construction map. Scheduled to wrap up May, 2015.
hitfactor
 
Posts: 77
Joined: Tue Apr 15, 2014 10:05 pm
Location: Berrien County, Michigan, U.S.A.
Has thanked: 24 times
Been thanked: 24 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby GizmoGuy411 » Wed Jul 02, 2014 10:37 pm

Thank You. I've requested that other US Champs comment here.

My feeling is that we may just need to let the Wazers post reports as the construction crews move along the freeway.

Changing the entire freeway name could result in unexpected problems, including the loss of the I-94 shield in the maps.

Other Champs may have some better ideas.
Image

U.S. based Emeritus Global Champ
U.S. Local Champ
U.S. Country Manager
U.S. Great Lakes RC: IL, IN, MI, OH, WI
AM: NW OH, NE IN, SE MI
Wiki Profile
Verizon: Google Pixel XL & iPad "3"
GizmoGuy411
EmeritusChamps
EmeritusChamps
 
Posts: 1440
Joined: Wed Oct 13, 2010 3:14 am
Location: NW Ohio, SE Michigan, NW Indiana tri-state area
Has thanked: 765 times
Been thanked: 502 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby GizmoGuy411 » Wed Jul 02, 2014 8:51 pm

We probably do not want to be changing the name on that long of a stretch of freeway.

Can you provide a link to MDOT, and I'll bring up this in the US Champs Forum.
Image

U.S. based Emeritus Global Champ
U.S. Local Champ
U.S. Country Manager
U.S. Great Lakes RC: IL, IN, MI, OH, WI
AM: NW OH, NE IN, SE MI
Wiki Profile
Verizon: Google Pixel XL & iPad "3"
GizmoGuy411
EmeritusChamps
EmeritusChamps
 
Posts: 1440
Joined: Wed Oct 13, 2010 3:14 am
Location: NW Ohio, SE Michigan, NW Indiana tri-state area
Has thanked: 765 times
Been thanked: 502 times

Re: 56 Miles of median cable work I-94 from IN state line.

Postby CBenson » Sat Jul 05, 2014 10:56 am

jasonh300 wrote:Adding Construction Zone to an Interstate name will probably break the shields, since that name isn't in the shields database.

I don't know about this. I can't find an interstate name that is currently breaking the shield on a freeway segment anywhere on the map. "I-895 N Spur" shows a shield for 895. "I-95 I-495 N" shows a shield for 95. "I-95 I-495 N Thru" shows a shield for 95. "I-95 S / Richmond" shows a shield for 95. "I-495 N / Tysons Corner" shows a shield for 495.
Regional Coordinator: Mid-Atlantic, US
Verizon, Nexus 6, Android 6.0.1, Waze 4.7.0.902
CBenson
EmeritusChamps
EmeritusChamps
 
Posts: 10330
Joined: Wed Nov 03, 2010 9:13 pm
Location: Crownsville, MD, US
Has thanked: 1055 times
Been thanked: 2353 times

Next

Return to Michigan

Who is online

Users browsing this forum: No registered users