Get a sneak peek at whats next for Permanent Hazards on our April 7th Office Hours!
Post by jringo91
This intersection 185th CR-60/Kenrick CR-50 will be closed starting May 4 2015 - Sept. 1 2015 I am not sure where the detours will be. I do know they are adding stoplights at 165th/Ipava and 175th/Ipava I received this closure data directly from the city of Lakeville. I will update if things get moved up,Thanks JRingo https://www.waze.com/editor/?env=usa&lo ... s=20696369
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by jringo91
Please Close Minnetonka Blvd Bridge Over Mn State Hwy 100 between Salem and West Lake Street Starting Monday March 23, 2013 Through fall of 2015 also All of the Highway 100/Minnetonka Boulevard ramps, except the ramp from southbound Highway 100 to Minnetonka Boulevard, will also close. Thanks,JRingo91

https://www.waze.com/editor/?env=usa&lo ... s=25005119

News story link
http://kstp.com/news/stories/s3734411.shtml
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by jringo91
DallasGrant wrote:
Jringo91 wrote:This intersection 185th CR-60/Kenrick CR-50 will be closed starting May 4 2015 - Sept. 1 2015 I am not sure where the detours will be. I do know they are adding stoplights at 165th/Ipava and 175th/Ipava I received this closure data directly from the city of Lakeville. I will update if things get moved up,Thanks JRingo https://www.waze.com/editor/?env=usa&lo ... s=20696369
Do you know what all will be closed here ... with it be just what connects to the intersection or more?
Dallas, The entire intersection will be closed I am not exactly sure where the streets themsevles will be closed at. I just want to make sure that the intersection itself is closed on that specific day.This is a *Major* closure and this closure will cause many URs in a short period of time,it will be a major detour.
My best educated guess would be from the intersection
Kenwood Trail would be closed from Jaguar Path from the North to 188th Street to the South
185th Street would be closed from Joplin Path from the West to Jasper Path to the East
That is my best guess, It is only 2 miles from my home, I will keep an eye on it if anything changes!
Thanks, JRingo
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message
Last edited by jringo91 on Tue Mar 24, 2015 8:38 pm, edited 1 time in total.

Post by jringo91
DallasGrant wrote:
Jringo91 wrote:Please Close Minnetonka Blvd Bridge Over Mn State Hwy 100 between Salem and West Lake Street
Done :)
Thank You Dallas!
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by jringo91
DallasGrant wrote:
Jringo91 wrote:Please Close Minnetonka Blvd Bridge Over Mn State Hwy 100 between Salem and West Lake Street
Done :)
Thank! You Dallas
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by jringo91
Dallas
Please close Hwy 100 in both directions "North and South" from

Hwy 62/Crosstown to I-394

https://www.waze.com/editor/?env=usa&lo ... s=25264430
https://www.waze.com/editor/?env=usa&lo ... s=25264430
https://www.waze.com/editor/?env=usa&lo ... s=25264430
https://www.waze.com/editor/?env=usa&lo ... s=25264430

http://www.dot.state.mn.us/metro/projects/hwy100slp/

All Entrance and exit ramps between these two points need to be closed accordingly also please. The closure starts this evening @ 21:00 on Friday 3/27/2015 until 05:00 on Monday 3/30/2015
Sorry such short notice, I just saw this closure this morning
Thanks, JRINGO
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by jringo91
Dallas, The roundabout is finished and I just recieved a update that this will be opening tonite at 6PM. I will update the map once i have driven it and can note the changes! Thanks Jringo
https://www.waze.com/editor/?env=usa&lo ... s=20699696 https://www.facebook.com/pages/City-of- ... 80?fref=ts
jringo91
Map Raider
Map Raider
Posts: 25
Has thanked: 14 times
Been thanked: 4 times
Send a message

Post by karrows
TheGo2SWATking wrote:Sections of 4th Street and 5th Street in downtown Minneapolis will be closed due to construction on the Vikings stadium.

I haven't been able to find any official reports besides some news articles. There are also some reports around the area from people who were routed through the closed roads.

http://kstp.com/article/stories/s3766632.shtml
http://www.startribune.com/5th-st-by-vi ... 298029621/
http://www.startribune.com/commuters-wi ... 290150641/
I put the closure on 4th St S in Minneapolis.

I found this site yesterday for Minneapolis road construction. It is very helpful!
--Edit-- Old link didn't work. This one should work.
http://arcg.is/1AsA2Ha

TheGo2SWATking, the other ones are outside my editable areas.
karrows
State Manager
State Manager
Posts: 112
Has thanked: 5 times
Been thanked: 52 times
Send a message

Post by karrows
GadgetMTS wrote:I-94W ramp to US-52 closed: R5 editor with access required.
https://www.waze.com/editor/?env=usa&lo ... st=4586798

From MN511: At US 52 (Saint Paul). The exit ramp is closed due to road construction work. Until September 15. Comment: WB 94 exit ramp to SB 52 will be closed until September 14th, 2015.

A couple of URs to solve for this as well.
I added this closure
karrows
State Manager
State Manager
Posts: 112
Has thanked: 5 times
Been thanked: 52 times
Send a message

Post by karrows
GadgetMTS wrote:MN-100 NB Closure: 9/11/15 (7:00?)- 9/14/15 (18:00?)
https://www.waze.com/editor/?env=usa&lo ... 0,57745074

From MN511
Between Exit 1A: I-494; Normandale Boulevard and Exit 2AB: MN 62 (near Edina). Road closed. Construction work. Starting September 11, 2015 until September 14.
I added the one on 100, it was just barely in my area. I do not have 494 in my editable area, so I can't do that one.
karrows
State Manager
State Manager
Posts: 112
Has thanked: 5 times
Been thanked: 52 times
Send a message