Road Closure Request - Athgarvan Road, Newbridge

Post by shane_meagher
Hi,

There is currently a road closure on Athgarvan Road, Newbridge from entrance to Supervalu to Lidl entrance. This corresponds to Phases 1 & 2 of the notification on Irish Water website.
nax8jq2fpab2a7vt58ai5l9j95xgmf3.jpg
Road Closure Phasing
(201.07 KiB) Downloaded 84 times
Road closures:

Phase 1: 10 February – 17 February; Entrance to Lidl carpark to Newbridge Retail Park. Access to carpark will be maintained throughout road closure.

Phase 2: 17 February – 25 February 2021; Newbridge Retail Park. Access to carpark will be maintained throughout road closure.

Phase 3: 26 February – 4 March 2021; Newbridge Retail Park to Dunnes Stores back exit. Access to this exit may be impacted over two nights.

Phase 4: 5 March – 8 March 2021; Dunnes Stores back exit to Cill Dara Business Park entrance. Access to Cill Dara Business Park will be maintained.

Phase 5: 9 March – 17 March 2021; Dunnes Stores back exit to Moorefield Park entrance. Access to Cill Dara Business Park will be maintained using other access road. Access to Moorefield Park estate will be maintained.

Phase 6: 18 March – 23 March 2021; Cill Dara Business Park to Newbridge Shopping Centre. Access to Moorefield Park and Newbridge Shopping Centre will be maintained

Stop/Go Shuttle System:

Phase 7: 24 March – 25 March 2021; Moorefield Park to Newbridge Shopping Centre entrance. Access to Moorefield Park and Newbridge Shopping Centre will be maintained.

Works will demobilize over the Easter period and the Athgarvan Road reopen between 27 March and 6 April. Works will resume on 6 April with stop/go shuttle system in place for the remaining phases.

Phase 7: 07 April – 09 April 2021; Moorefield Park to Newbridge Shopping Centre entrance. Access to Moorefield Park and Newbridge Shopping Centre will be maintained

The details of the remainder of the stop/go shuttle system are currently in draft and subject to further discussions and final agreement with the relevant roads authorities. We will endeavour to keep you updated as the project progresses
Permalink: https://waze.com/editor?env=row&lat=53. ... ,211890415

Reference: https://www.water.ie/projects-plans/new ... terupgrad/

Thank you in advance,
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times

POSTER_ID:17440220

1

Send a message

Post by shane_meagher
Yes, I think it reads that Phase 1 should end on 17th at 23:59 and Phase 2 start on 17th at 00:00 as there will be overlap.

Realistically though, the dates are already looking indicative as they have closed off both Phase 1 and Phase 2 sections as of Thursday evening, 11th.

Sent from my ONEPLUS A5010 using Tapatalk
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Will do. Thanks.

Sent from my ONEPLUS A5010 using Tapatalk
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message
Last edited by shane_meagher on Mon Feb 22, 2021 2:34 pm, edited 1 time in total.

Post by shane_meagher
@YanisKyr,

The next phase (3) is active now. Phase 1 has reopened so there is access to Cill Dara Industrial Estate from both ends.

Thanks,
Shane

Sent from my ONEPLUS A5010 using Tapatalk
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Ya that looks about right. Thanks.

Sent from my ONEPLUS A5010 using Tapatalk
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Hi @YanisKyr,

Phase 4, 5 & 6 are now active. Phase 1-3 have been reopened.

Works appear to be running ahead of the schedule provided originally.

Thanks.
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Hi @YanisKyr,

Closures under the above phases 1-7 have been completed.

The entrance to Cill Dara Industrial Estate is still closed (https://waze.com/editor?env=row&lat=53. ... =211890499).

Phase 10 of the updated plan is now underway:
https://www.water.ie/projects-plans/new ... terupgrad/

https://www.water.ie/_internal/cimg!0/9 ... 2unj5cj3qv
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Hi YanisKyr,

Yes that looks correct. They seem to have been running ahead of time up to now but I guess we can only work with the advertised dates.

Agree the drawings are difficult to read for the public. Guess somebody was lazy and just took the detailed site works drawings used for getting the road closures.

Thanks,
Shane
shane_meagher
Posts: 23
Has thanked: 1 time
Been thanked: 3 times
Send a message

Post by shane_meagher
Hi Yanis,

Sorry hadn't been there recently to check.

Works have now moved on as noted in this map issue:
https://www.waze.com/editor/?zoom=5&lat ... st=1581190

The current update on the Irish Water website https://www.water.ie/projects-plans/new ... terupgrad/ has the current work sequence but no dates:
Phase 11: Athgarvan Road (Military Road)/R445 Junction (commencing 14 May 2021)
Phase 12: R445 (outside Tesco/Woodies)
Phase 13: R445/ Moore Avenue Junction
Phase 14: Road closure at R445/Morristown Road/Green Road junction
Phase 15: Tie in works will be required at R445/Green Road junction. It is expected that the majority of this work will take place in green area of Moore Park