Get a sneak peek at whats next for Permanent Hazards on our April 7th Office Hours!
1. Include the city and province in the "Subject:" line of your post.
2. Include a Permalink to the segment(s) you wish to unlock or have updated.
3. Provide a short explanation of why you need the unlock or update done.
4. Thank the user who solved the request and mark the thread Solved.


Please note that a higher level editor may choose to fix an unlock request themselves so higher value segments will remain protected at their level.

Post Reply
Forum rules
Instructions for posting (click here)

1. Include the city and province in the "Subject:" line of your post.
2. Include a Permalink to the segment(s) you wish to unlock or have updated.
3. Provide a short explanation of why you need the unlock or update done.
4. Thank the user who solved the request and mark the thread Solved.

Please note that a higher level editor may choose to fix an unlock request themselves so higher value segments will remain protected at their level.

Level 5 update: Montreal QC

Post by StBza
Rue de la Cathédrale is blocked completely on long term for constructions between Boul René-Lévesque Ouest and Rue de la Gauchetière Ouest.
Access should be restricted coming straight from Rue Metcalfe or when turning right from Boul René-Lévesque Ouest.

https://www.waze.com/editor/?env=usa&lo ... s=65454376

Thank you,
StBza
Posts: 13
Has thanked: 9 times
Been thanked: 2 times

POSTER_ID:16397320

1

Send a message
[img]https:///mSz3t[/img]

Post by StBza
Thank you very much. I will post again when the road is open again for traffic. I pass by there every day.
StBza
Posts: 13
Has thanked: 9 times
Been thanked: 2 times
Send a message
[img]https:///mSz3t[/img]

Post by Taxy57
Hi,

I drive by too, to get work.

I have a look on the 2 segments below De la gauchetière.
I had put a restriction till the end of the month.

These segments are lock level #1.
I add another month if necessary.


LVL #1 WaseYves
Taxy57
Country Manager
Country Manager
Posts: 6431
Answers: 9
Has thanked: 264 times
Been thanked: 2078 times
Send a message

Post by Webs101
It's done. There was a restriction in place that expired July 20, which according to the city was when work should have finished: http://ville.montreal.qc.ca/portal/page ... ema=PORTAL

Obviously, that did not happen.

I'll detach the road to make it obvious and hope somebody reports when the work is actually complete.
Webs101
Waze Global Champs
Waze Global Champs
Posts: 1880
Answers: 7
Has thanked: 299 times
Been thanked: 791 times
Send a message
https://shitcafe.com/waze/waze-sig.png
Global champ from Canada