Closure Auto(4) Surrey - West Molesey (First Ave)

My level = 3
Gas main replacement

Please apply a closure from 24th.Feb to 22nd.Mar to this segment.

The TPTO specifies 24hrs though one.network has the start at 07:00 and the end at 16:00 which almost implies daytimes only.

If traffic provides a temporary cancellation (from Wiki)

I presume this means the closure would be re-enacted, and therefore shown (again) on livemap.

Closure added, these types of works are difficult as some are daytime only, some are done in sections, some are 1-way only, all depends on where the main actually runs.

As for RTCs yes, if Waze detects traffic using the road it will open it temporarily and show it closed again after certain time, or at least that is how it is supposed to work.