Hi, this part of the A507 is shut from 8pm on the 16th March through until 6pm on the 18th March for resurfacing
Can a Level 4 please apply the closures? Thanks
https://twitter.com/CBC_Highways/status/971406933503758336
Hi, this part of the A507 is shut from 8pm on the 16th March through until 6pm on the 18th March for resurfacing
Can a Level 4 please apply the closures? Thanks
https://twitter.com/CBC_Highways/status/971406933503758336
Closure added. Managed to get the roundabouts and two way bits right first time this time. :lol: