[CLOSURES] Various, Woking Town Centre (Round 1)

Reason for closures: Essential Utilities Works

Start Date/Time: Monday 30th January 2017, 4am

End Date/Time: Sunday 5th February 2017, 11:59pm

Permalink of segments which need closing: Here

Further Information: Here (there are details of the next round of closures there too, which could be added also. I can clarify which segments if anything is unclear).

Thanks. Closures input.

It would be much appreciated if you as a local editor could continue to work out the permalinks and post to this forum, so that all a senior editor needs to do is click a few buttons. :smiley:
Just one thing, the permalink needs zoom level 4 (or higher) for "street"s to show, 2 (or higher) for "highway"s.

Ian

Thanks Ian, I accidentally stripped out the zoom level when removing the URL parameters for custom layers, etc.

Just looking at the closures which have been input ready for next week, the Church Street West closure should be a two-way closure. Many thanks.

I will pull together the permalinks for the next round of closures towards the end of next week, in case the dates change / the first round overruns.

Learning point for me - if you have a single selection with a mixture of 1-way and 2-way closures, then Waze defaults the closure to 1-way only. :frowning:

Corrected.

Hi Ian, as pointed out in another thread, these closures stopped on Sunday night (but were accidentally entered into Waze to end in March, so are still active on the map/client).

Furthermore, the next round of closures are now in place and need to be entered into the database. Details in the following thread.

Thanks again

:oops: Now removed.