As of 31 Jan '13, this has been completed and can be closed.
I need a Level 5 to connect these new ramps: https://www.waze.com/editor/?lon=-74.50739&lat=40.26447&zoom=5&layers=BFTFFTTTTTTFTTTTFTTTTFT&segments=70848123,70848285,70848192,70848120 up with the NJ Turnpike. The new toll plaza is partially open today and fully open on this Friday.
On Friday (25 Jan EDT) these ramps need to be removed: https://www.waze.com/editor/?lon=-74.50942&lat=40.26602&zoom=5&layers=BFTFFTTTTTTFTTTTFTTTTFT&segments=31694599,31678741,63952168,31678740,63952167,31694694,31675064,57795900,66187442,31670091,31676285,57795897
For reference: http://www.njturnpikewidening.com/pdf/603%20Construction%20Activity%20Notice%20revisions_1-18-13.pdf
Note: The road shown connecting the Turnpike to the bypass in the DOT diagram is NOT complete and not expected to be open on Friday.
Thanks. Based on an error report that just came in, it looks like the turn on to this ramp: https://www.waze.com/editor/?lon=-74.51002&lat=40.26287&zoom=5&layers=BFTFFTTTFTTFTTTTFTTTTFT&segments=63952253 should be marked as not allowed since that ramp is apparently now closed.
Thanks again
These should be the last ones: https://www.waze.com/editor/?lon=-74.50903&lat=40.26375&zoom=4&layers=BFTFFTTTTTTFTTTTFTTTTFT&segments=63952253,70848123,61830516,70848192 Just need the off ramps to the new exit connected to the turnpike with the turn on to both allowed. I think I should be able to remove the old ramps on Friday when they’re fully shutdown.
And thank you again. I think we should be all set now 
I hate to double post, but now that the old exit is closed, these ramps need to be deleted: https://www.waze.com/editor/?lon=-74.5094&lat=40.26501&zoom=5&layers=BFTFFTTTTTTFTTTTFTTTTFT&segments=66187442,31670091,57795897,31676285,31694694,57795899,57795900,31694599,31678741,31678740,63952167,63952168
And these segments need to be connected: https://www.waze.com/editor/?lon=-74.4989&lat=40.26915&zoom=7&layers=BFTFFTTTTTTFTTTTFTTTTFT&segments=67792058,70910690