Hi editors,
I would like you to help me by adding a road closure.
- Reason: complete renovation of the roadway and sidewalks. These works aim to calm traffic by reducing the roadway width to 4.5 m while maintaining two-way traffic and access for fire-fighting vehicles. Traffic speed will also be reduced to 20 km/h.
- Closing date: 2026-07-06
- Closing time (local time): 00:00
- Opening date: 2026-09-06
- Opening time (local time): 23:59
- City: Boulogne-Billancourt
- Road name: Boulevard Périphérique
- Permalink: https://waze.com/fr/editor?env=row&lat=48.83289&lon=2.23020&marker=true&zoomLevel=20&segments=240246403
- Closure direction (A->B, B->A or in both directions): in both directions
- Periodicity: 24/7,
- Source: https://atlas-sig.seineouest.fr/documents/AvisRiverains/BB_avenue_du_Marechal_Juin_0626.pdf
Thanks in advance