The are a couple of long term closures coming up on Saturday April 11th, 2015 for the Renner Blvd. and the exist for Renner Blvd at K10.
https://www.waze.com/editor/?env=usa&lon=-94.77560&lat=38.93863&layers=933&zoom=4&segments=67860541
Documentation can be found here:
http://jocogateway.com/traffic-alerts/
and here:
https://www.ksdot.org/kcmetro/laneclose.asp
Thanks!
I don’t know if these closures ultimately went live today or not. One of the sources mentioned sometime April 14 - Until August. So for now I’ve set up the closure to start at 9am on April 14 and to end precisely on Aug 1 (midnight).
Will that work?
It looks like they are running behind on the College Blvd project, thus the delay on closing of Renner Blvd.
Thanks!
No sweat. If that changes or a more exact time for starting the closures is divulged just let me know.
It looks like they delayed the closure till tomorrow.
“K-10 & Renner Boulevard Interchange Project
EXPECT DELAYS! UPCOMING 24/7 ROAD & RAMP CLOSURES: All lanes of Renner Boulevard at K-10, eastbound K-10 to Renner Boulevard exit ramp and Renner Boulevard to eastbound K-10 entrance ramp will be CLOSED to all traffic, 24/7 round the clock, beginning sometime next Tuesday, April 14, weather permitting. Renner Boulevard is scheduled to reopen in mid-September 2015, and the eastbound K-10 Renner Boulevard ramps are scheduled to reopening August 2015. SPECIAL NOTE: Renner Boulevard and the adjacent K-10 ramps will FULLY CLOSE once College Boulevard is opened to four-lanes of traffic which is planned for some time during the day nesxt Tuesday, April 14. Renner Boulevard at K-10 cannot fully close until College Boulevard is fully opened to four lanes of traffic. Marked detours will be provided. Project work is scheduled to be completed in Late Summer 2015. (REV. 4-10-15)”
http://www.ksdot.org/kcMetro/laneclose.asp
We should be on track then. Thanks for confirming.