Hi, can a L4+ editor add a closure to the below segment. Its closed every day between 09.30 and 16.00 every day until 25.10.
https://portal.one.network/downloads/tm/road-closure-full-order-114993415-3184888.pdf
Thanks, Kevin.
Hi, can a L4+ editor add a closure to the below segment. Its closed every day between 09.30 and 16.00 every day until 25.10.
https://portal.one.network/downloads/tm/road-closure-full-order-114993415-3184888.pdf
Thanks, Kevin.
Closure input.