Hi
Pytchley Rd Rail Bridge is closed to through traffic untill end Feb 2014 due to railway upgrading work associated with line electrification.
see http://www.networkrail.co.uk/news/2013/nov/Pytchley-Road-bridge-Kettering-temporarily-closed/
http://www.kettering.gov.uk/download/meetings/id/9925/10_network_rail
Could a L5 confirm delete bridge / lock that section
Thanks