hi,
i need access to these roads “lvl 3” to follow the road closure / opening / transitions
i got access to all the geometries that gonna be effective for each day’s of the opening of the
“pont jetée temporaire iles des soeurs” and all the access ramps closure sequence to make the transition, and 80% of the area won’t be in service for the next 2 years or so
“north bound will be on the new structure on the 4th october”
“south bound will be on the new structure on the 6th october”
6th october the current bridge will be close for the next 2 years for reconstruction
should the bridge sections should be deleted or put in a temporary state until re-opening ?
thanks
https://www.waze.com/editor/?env=usa&lon=-73.54213&lat=45.47091&layers=900&zoom=5&segments=64653277,72352465,60577153,60747799,64653282,60783590,64653278,64653284,72352463,78940947,75683252,75683256,75683257,75683251,60614046,63024533,78941013,78940648,64462967,66384371
i think then i got them all
https://www.waze.com/fr/editor/?env=usa&lon=-73.54367&lat=45.47102&layers=1925&zoom=6&segments=60708684,64653271,81229626,81229624,81229625,81229278,81229279,75683257,75683251,75683252,75683256,64653278,78940947,60783590,64653282,60747799,60577153,72352465,64653277,63024533,60614046,78941013,78940648,64462967,66384371
ECC did some modifications, but the bus line got some errors and the exit is 200m offset so it need to be bring back like 100m to be more accurate, not pass the actual exit but in the exit lane transition in this exit is 308m long highway 15 nord exit #60 on the new brige section
https://www.waze.com/editor/?env=usa&lon=-73.54948&lat=45.47199&layers=133&zoom=5&segments=82032519,60747799,82032566,60577153,82032565
thanks to bring them back to lvl 3
Okay, I’ve reset it to level 3.
I was looking for maps to get the ramps and bus lane correct. There isn’t much online except for large-scale views.
the bus line isn’t completed, and is still an inverted line from the right shoulder whit a traffic light at afternoon rush hour,
(still i got acess to the actual maps of the construction teams (autocad and pdf), (limited acess)
oups forgot this one to disconect the old high-way
https://www.waze.com/editor/?env=usa&lon=-73.55488&lat=45.47163&layers=133&zoom=6&segments=72352465,64653277,82032603,82032518
the arrow was a basemark as the start of the exit lane, but it’s still in the curve, and it’s 300m long exit lane, so it’s good as i did set it (think so)
in the exit 60 north the lane to autoroute 10 (bonneaventure) is planned to take the place of the old overpass place of verdun (shown on the base-map) but i dont know the progress of that construction
(is planned to reduce the curve in the exit) … but the highway curve enouf !!
still this is temporary work (cost 100 millions) untill the new bridge is rebuild between montreal end ile des soeurs
p.s. construction signalisation and security usually cost 10% of the construction of a road