My Level: 3
Reason for request: New alignment needed for Hwy 1 with diversion due to construction. Will employ the same technique used for the north diversion.
https://news.gov.bc.ca/releases/2018TRAN0183-002091?utm_source=dlvr.it&utm_medium=twitter
Lowered
Did you forget this one ?
Still awaiting a tile build, need to transition some of the TRs to RTCs once that occurs.
Tile build occurred and now ready for relock. Will add RTCs once relock occurs.
New Permalink
It can’t be relock while RTC is in effect
RTCs removed. Needs to be relocked ASAP as I need to add back the RTCs when the next tile build occurs.
Locked
Can you explain to me why these are Freeway type roads rather than ramps?
Traffic shifted onto these new segments while the interchange is constructed. Currently don’t function as ramps as used by all through traffic on Hwy 1.
https://engage.gov.bc.ca/app/uploads/sites/166/2018/10/6420_McKenzieInterchange_Map.pdf
https://engage.gov.bc.ca/mckenzieinterchange/
So are these segments now closed? https://www.waze.com/en-US/editor?env=usa&lon=-123.40377&lat=48.45969&zoom=5&segments=513074402,513074389,513074645,513074760
10-4. I had the RTCs removed to allow relocking. Kayos our local champ is in the loop on this setup.
Right, I forgot about that in your original post. Ok, all good ![]()