Can someone with editing rights over Slough please add these planned & current road closures to the map.
http://www.segro.com/Slough/Leigh-Road-Bridge/
http://www.segro.com/global/images/57849/125564/Leigh-Road-Bridge-Overall-Impacts
Thanks!
Can someone with editing rights over Slough please add these planned & current road closures to the map.
http://www.segro.com/Slough/Leigh-Road-Bridge/
http://www.segro.com/global/images/57849/125564/Leigh-Road-Bridge-Overall-Impacts
Thanks!
Since this seems to be your first post, welcome to the forum.
You seem already to have put a time restriction on the map for the long-term closure of Bedford Avenue, so that’s dealt with.
If I understand correctly, nothing else is closed until the 26 Jan - 5 Feb closure of the railway bridge and nearby roads. I’ve added this to the “UK Closures” Google doc that some of us have access to. I’ve put a link in, but you probably won’t be able to access it. Waze staff copy data from this onto the same closures system as gets used when you hit the “closures” button in the app. The advantage of doing this way is that the closure shows up in the app as red bars, thus showing the user why he’s not being routed along the road.
After that, it looks like nothing else is required until July 2015. The system may well have changed by then, but if not and you’ve been doing enough editing to build up a record, I should think Timbones might let you have access to the Google doc if you ask nicely.
PM me or post to this topic again if you need me to do anything else.
Ian
Sounds good, many thanks Ian…
Date of Jan/Feb main bridge closure changed, now 28 Jan - 9 Feb. Now recorded on the Closures system on the Beta map editor rather than the Google spreadsheet.
Now 4-16 Feb.
February closure finished.
I’ve put in Beta editor closures for the remaining closures July-September 2015, although the exact end date is yet to be announced so I’ll probably have to tinker later.
I’ve also changed the original time restriction, closing Bedford Avenue for use as the works depot, into a closure for consistency (and because I think it looks better on the app).
All documented with [CLOSURE] UR’s.
Ian