Hello,
The “Pont de Wépion” on N62 bridge is closed for roadworks (new motorbike protection rails, new barriers).
The bridge is locked L4.
Beginning : 20 Juin 2014
end : possible reopeing on September 1st, 2014, but certainly not before.
reference : http://www.lavenir.net/article/detail.aspx?articleid=DMF20140613_00490237
Traffic on both sides is routed to the next bridge in south direction (in Profondeville).
Thanks,
Ben