Need to have Shawnee Mission Parkway unlocked from L5 to L2 to address UR https://www.waze.com/editor/?env=usa&lon=-94.73915&lat=39.01438&layers=4005&zoom=7&mapUpdateRequest=4163143 and UR https://www.waze.com/editor/?env=usa&lon=-94.73915&lat=39.01438&layers=4005&zoom=7&mapUpdateRequest=4151619. An intersection for Noland Rd and SMP needs to be built due to new construction.
I’ve unlocked some of the immediate roads. I updated two at-grade connectors nearby so they’d at least by Primary Street status. They also wouldn’t need a street name as they’ll inherit the name of the road their next connected to. You’ll also note I create a 90 deg angle for the at-grades. This will create a “Turn right…” prompt instead of “Stay right…” which isn’t technically right since you’re connector is actually a dedicated are to facilitate the turn.
Let me know when you’re all wrapped up as some of the higher level roads need to be re-locked for protection purposes.
Also, when providing a permalink, please select the segments or multiple segments you need unlocked and then create a permalink. It auto-selects those segments in the link and makes unlocking exactly what you need even faster.
Didn’t know about the segment selection thing. Good info to know. I’ve made the updates for Noland Rd and made the Turn allowances. All good to lock it back up.