Works and installation of a traffic calming device. Single-lane traffic with traffic lights during the works, duration 2 months.
geoJSONGeometry
{“type”:“Polygon”,“coordinates”:[[[5.039211540668424,50.709660604263256],[5.039337604492126,50.709708162516414],[5.039756029098496,50.70928353354954],[5.039865999668111,50.70927164388306],[5.040201275794953,50.70892514370886],[5.0400269322089875,50.70887079050817],[5.039686291664146,50.709220688136],[5.039648740737882,50.709220688136],[5.039211540668424,50.709660604263256]]]}