Hello, a new roundabout is being implemented at the Bourneside Boulevard & State Road 70 intersection in Manatee County, and shifting traffic to newly constructed roadway south of the existing roadway, during ongoing roadway construction. The traffic pattern switch is schedule to be implemented on 06-12-2025 around noon. The current configuration on Waze, and on location, has the existing 4-way intersection shown. There are significant changes to traffic alignment and permitted movements. The attached PDFs show the permitted movements and the roundabout shown on the current traffic pattern. I am hoping someone can assist in making these changes on the map. Please let me know if I can answer any questions. The below link directs you to the FDOT project page for the SR 70 Roundabout project. My name is Dylan DiCarlo, I am with CDM Smith, who is working as a consultant of FDOT to manage this construction project. Thank you! 414506-7 State Road (SR) 70 from Lorraine Road to Bourneside Boulevard Widening Project

Map location: https://waze.com/en-US/editor?env=usa&lat=27.41306&lon=-82.34697&zoomLevel=16&nodes=509682590

1 Like

Hi. Thank you for your post and the provided links.
We are looking into implementing these changes as quickly as possible and will get back to you if we need additional information.

1 Like

Hi, I have made the updates for the roundabout to the map. It will take a few days for the map tile update so it reaches the app. Thanks.

1 Like