Both of these on ramps are closed due to construction. I understand the proper procedure is to disconnect them, is this correct? They are both locked at level 5.
Thanks!
*ETA My editor rank is 1
and
Both of these on ramps are closed due to construction. I understand the proper procedure is to disconnect them, is this correct? They are both locked at level 5.
Thanks!
*ETA My editor rank is 1
The question on proper is a mixed bag. For us beta testers, to disconnect segments it is a yes and no depending on situation of length. Even then, the beta feature (time restriction) isn’t completely working correctly to implement, so for long term closures it was expressed to me, yes disconnect. While on the other hand, it was expressed to me that “if there is a road, it should not be disconnected” which I agree to if the features worked as they should. On that note, how long is this construction? Do you have DOT links possibly, or news station coverages?
Let me know and I’ll help get you the correct solution, thanks!
None listed currently. Are the ramps still closed?
Thanks for the reply. According to MDOT, they were supposed to be reopened, but I won’t be by that way until tomorrow. I’ll let you know then.
So as of this morning, both of these ramps are still closed.
Let’s assume the ramps are closed as part of the southbound lane construction:
US-127 Lane Shift
From: 5/17/2013, 5 AM
To: 8/16/2013, 7 PM
Location: Southbound US-127 between Lake Lansing Road and M-43
Description: Expect a traffic shift on southbound US-127 for auxiliary lane construction.
US-127 Lane Shift
From: 5/30/2013, 6 AM
To: 8/16/2013, 12 AM
Location: Southbound US-127 between M-43 (Saginaw Street) and I-496
Description: Expect a traffic shift on southbound US-127 for auxiliary lane construction.