Level 5 Closure - M4 - Hill Rd On Ramp

Closures on these segments require updating.

https://www.waze.com/editor/?env=row&lon=151.05336&lat=-33.85029&layers=133&zoom=6&segments=295337231,295337230,295337227

Closure from 8pm January 11 2015 to 4:30am March 6 2016.

Ref: http://www.westconnex.com.au/news/news_items/news_2015/151222_Hill_Road_onramp.html

I’ve updated the closure times for the ramp.

Start of closure time should be 11pm January 8th 2016

Changed to 11pm, January 8.

Thanks Lakey :wink: