105 Champagne Ave S is closed both directions due to lengthy construction delays due to contractor, fire etc.
Ottawa City doesn’t list this as a road closure.
Not having this updated sends Wazers and Uber driver’s driving in circles around the street because there is no closure on the map.
I’ve tried to make a comment and event. I’m too low ranked to fix this.
Access to 100 and 101 Champagne Ave S is not affected.
No end date given, but it will last at least 6 months.
Thanks.