I posted a comment in the editor, but was unable to close the road due to not being level 3.
The culvert is being replaced until october. Project details here:
https://www.kenmorewa.gov/our-city/projects/current-projects
Facebook post by the city of kenmore here:
<iframe src=“https://www.facebook.com/plugins/post.php?href=https%3A%2F%2Fwww.facebook.com%2Fkenmorewa%2Fposts%2Fpfbid02H5xX2WrLpqdpSobjt9g2cT7eFiYSK6qReBoMieEQKCTigr8rUYvuzYhTE51fEBwXl&show_text=true&width=500” width=“500” height=“693” style=“border:none;overflow:hidden” scrolling=“no” frameborder=“0” allowfullscreen=“true” allow=“autoplay; clipboard-write; encrypted-media; picture-in-picture; web-share”></iframe>
Thanks for the post. To get everything to match what the city has will take at least a day. I have made the initial changes. After that we can put a closure in that doesn’t affect the houses on that street.
Permalink to find the location in the future.
Hello,
I have been trying to update the map with the continued closure, but it doesn’t seem to be picking up on the live map. I contacted the city and received a reply that the closure is at least through January and possibly till spring at this point.
From the City: “With that said, weather permitting and scheduling work we hope to have most of the work done in January with the exception of final lift of pavement and pavement markings to be done in the Spring.”
I have added the closure back in and removed your restrictions (the restrictions wouldn’t be live until tonight, but my closure is live now). The closure allows us to remove it without waiting for a tile update (your restrictions aren’t in place yet because of delayed tile updates).