If the road was closed due to construction, editing it would not be required. What it would need is a Real Time Closure (RTC). These can only be added by editor with Rank 3 or higher. Is the road closed in both directions? Do you have an estimate on how long it will be closed? Is it just the segment you indicated, or are there additional segment to be closed as well?
This segment of the road, along with the one directly north on 4th St, are closed in both directions. It’s torn up down to the dirt at the moment. I will try to determine how long the closure is planned.
This segment of the road, along with the one directly north on 4th St, are closed in both directions. It’s torn up down to the dirt at the moment. I will try to determine how long the closure is planned.
I’ll drive over there at lunch and get the boundaries of the closures. I’ve added Mount Mercy from Bridge to Valley for the resurfacing project based on the news release.
That is not the other segment. The other segment with road construction is the segment on 4th St NW that runs parallel (east/west) to Mount Mercy Dr before the diverge.