The waterproofing works and full closure of the Story Bridge will be undertaken from 9pm Friday 27 April 2018 until 5am Monday 30 April 2018, weather permitting.
Based on the maps, I think that is right. The maps provided by Brisbane City Council seem very vague about which streets are closed.
https://www.waze.com/en-GB/editor?env=row&lon=153.03542&lat=-27.46114&zoom=6&segments=143190374
More closures. I did select these the first time, but they must not have come through with the mass permalinks.
Have the times for the closures been set for 9pm Friday 27th April to 5am Monday 30th April?
https://www.waze.com/en-GB/editor?env=row&lon=153.03672&lat=-27.47175&zoom=6&segments=104087218
This is the extra segment.
There were a couple of segments that Brisbane City council are showing as closed on their map, from where the detours are going to go, but do not directly lead to Story Bridge. And also there are some little streets that have entries onto the Story Bridge past where the closure point begins, both North and South.
I think the map that the Brisbane City Council has provided is poor for explaining which roads will be closed. It shows which direction to head if you wanted to cross the Story Bridge, but it does not show which actual streets will be closed.
Would be helpful.
There is a script for viewing closures but it appeared to not run when I tried to use it.